Information

  • Client / Site

  • Conducted on

  • Prepared by

Pool service checklist

  • Select date

Water Tests

  • Salt reading (between 3500 & 5500)

  • Water temperature

  • Free chlorine reading PPM

  • Total Chlorine reading PPM (3-5PPM)

  • Ph reading (7.2 - 7.6)

  • Total Alkalinity reading (90 - 150)

  • Calcium hardness reading (10 - 280)

  • Cyanuric acid (Stabiliser) reading (35 - 70)

  • Phosphate reading ( <1)

  • List of chemicals used to balance water chemistry

  • From a visual inspection, is the pool clear of any algae such as black spot?

Checklist of On-site Duties

  • Pool Vacuumed

  • Cleaned out skimmer(s)

  • Cleaned out pump basket(s)

  • Cleaned or back washed filter

  • Chlorinator cell acid washed

  • Time clock set to correct time and left on "Auto"

  • Chlorinator cell left switched "on"

  • Waterline clean and free of scum

  • Water level checked and topped up if required

  • After inspection the pool pump(s) is in good working order, running quietly and the seal for the wet end appears leak free.

  • CPR sign clearly readable and visible

  • Filter shed and pool surrounds clean and rubbish free

  • Pool gate(s) in working order and left closed

  • Client Onsite at time Service?

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.