Title Page
-
JANUS Reference
-
Customer Account (Bill) Number
-
Date/Time
-
Location
-
Surveyor/Installer Name
Survey
-
Conduct survey?
-
State details/reasons why survey abandoned
-
Supporting evidence for abandoned survey
-
Have you reviewed the generic risk assessment for this work type and completed a dynamic risk assessment if required?
-
Please review the generic risk assessment for this work type and complete a dynamic risk assessment (DRA) if required. A DRA is always required if a meter installation is to be carried out
-
Return visit/survey already completed?
Site details
-
Contact Name
-
Contact Number
-
Property Type
-
Use of sprinkler/unattended hosepipe
-
Swimming Pool or Pond >10,000L
-
Photo of Swimming Pool/Pond
-
Number of Supplies
-
Number of supplies to property (3+)
-
Number of Points of Entry
-
Number of Points of Entry (3+)
Supply details
-
Riser Positions
-
Pipe Material
- Black Poly
- Copper
- Iron
- Lead
- MDPE
- Other...
-
Other...
-
Pipe Size
-
Other...
-
Is Riser Stop Tap accessible?
-
Is Riser Stop Tap operable?
-
Isolates all fittings?
-
Supply Type
-
Shared with
-
Branch stop tap?
-
Is Main Stop Tap accessible?
-
Is Main Stop Tap operable?
-
Leakage detected?
-
Is hot water supplied by a communal system?
Installation
-
Existing meter?
Existing Meter Details
-
Make and Model
-
Serial Number
-
Reading
-
Location
-
Can a meter be fitted under this scheme?
-
Explain why a meter CANNOT be fitted under this scheme
-
Supporting evidence
Installation
-
Freezer kit required?
-
Ladders required?
-
Suggested installation location
Internal
-
If an external meter cannot be fitted, state reasons why
-
Suggested course of action
-
Supporting evidence
-
Return visit required by internal installation team?
-
Sketch of existing external MST, pipework and proposed meter location
New Meter Details
-
Tap "Add Meter" for each meter installed
Meter
-
Make and Model
-
Serial Number
-
Label
-
Meter Reading
-
Location
-
Location
-
Diameter
-
Cybil number
-
Fitted in an unheated room/location
-
Fitted by
Customer Declaration
-
Customer NOT present
-
I confirm that the meter has been installed to my satisfaction and I have witnessed the above reading(s)
-
Leave feedback?
-
Quality of Workmanship
-
Time Keeping
-
Cleanliness of site/appearance and attitude of operatives
-
Customer comments
External
-
Sketch of existing external MST, pipework and proposed meter installation
-
Agreed date of installation
-
Customer comments/feedback
-
Customer to sign to confirm that they are responsible/authorised to approve the reinstatement on shared drives and footpaths
Comments
Additional information
-
Additional comments
-
Additional photos