Title Page
-
JANUS Reference
-
Date/Time
-
Location
-
Team Leader
-
Gang Members
Excavation
-
Contact Name
-
Contact Number
-
Have you completed a dynamic risk assessment before commencing works?
-
Take photo of completed/signed DRA
Dig Details
-
Location of dig
-
Location of meter on Customer's property
-
Meter location
-
Have you completed a Permit to Dig?
-
Take photo of completed PTD (prior to excavation commencing)
-
Notice Duration
-
Notice No.
-
GPS Location of dig
Permit to Dig
-
Date/Time
-
Location
-
RA Number
Utility Drawings Available
-
Gas
-
Water
-
Electric
-
Required drawings available and checked prior to start of work?
CAT & Signal Generator (Genny) Details
-
CAT Serial Number
-
CAT Calibration Date
-
Signal Generator Serial Number
-
Signal Generator Calibration date
-
CAT & Genny checked/tested before use?
Dig Site - confirm pre-dig checks
-
Have you checked for chambers, drains, telegraph poles, road scarring or markers for high pressure pipelines?
-
Is CHAPTER 8 and Traffic Management (TM) in place as required?
-
Have you marked up located services and utilities 1m past where the excavation is to take place?
-
Is the work area free of overhead services?
-
Is the water flow in the area sufficiently controlled?
-
Do you have the correct tools for the works? (insulated tools etc.)
-
Is the job deemed safe to continue?
-
Team Leader - I confirm that the information given is correct and true to the best of my knowledge. Work is authorised to commence
-
STOP - Contact your supervisor for advice and further instruction prior to commencing the dig
-
Additional comments
-
If any of the above checks cannot be completed satisfactorily, contact your supervisor for advice and further instruction prior to commencing the dig
Excavation Details
-
CYBIL Number
Excavation
-
Location of excavation
-
Site photo pre-excavation
-
Existing material at location of excavation
-
Existing defects (damaged kerbs, walls etc)
-
Existing defects - comments
-
Trial hole?
-
Depth (m)
-
Length (m)
-
Width (m)
-
Permanent/Interim?
-
Excavation site clear?
-
Post-excavation site photo (clean/tidy area)
-
Explanation
-
Post-excavation site photo
-
Team Leader - Work Completed (PTD)
Job Timesheet
-
Start time (inc Travel)
-
On Site time
-
Job Completed
-
Lost time (explanation)
Meter Installation
-
Photo of open excavation with meter fitted
-
Number of boundary boxes installed
-
Make and Model
-
Serial Number
-
Reading
-
Size
-
Other...
-
Meter sticker
SLG
-
Cones
-
Signs
-
Barriers
Customer Feedback
-
Customer feedback?
-
Customer Comments
-
Quality of Workmanship
-
Time Keeping
-
Cleanliness of site/appearance and attitude of operatives
-
Customer signature