Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 PERSONAL PROTECTIVE EQUIPMENT (PPE)
-
1.1 Hard Hat In Use
-
1.2 Eye Protection in Use
-
1.3 Protective Gloves in Use
-
1.4 Face Fit Masks Available and In Use
-
1.5 Company Hi-Vis being Worn
2.0 SAFETY ON SITE
-
2.1 Staff have signed the Property Sheet
-
2.2 Confirmation that the Property Asbestos Sheet has been Signed
-
2.3 Barriers And Appropriate Signage in Place<br><br>The recommendation and guidance for signage and barriers is as follows:<br>2x signs upon entry to the property - ELECTRICIANS AT WORK - LOCKING OFF PROCEDURE IN PROCESS<br>1x sign on the external barrier - DANGER CONSTRUCTION SITE<br>1x sign on the chain across the landing (when applicable) - DANGER FLOOR BOARDS LIFTED! TRIPPING HAZARD
-
2.4 Locking Off Procedure In Use - Including Isolation for other Trades<br><br>The recommendation and guidance for signage is as follows:<br>1x Tag on the pad lock stating - LOCKING OFF PROCEDURE IN PLACE
-
2.5 All Floorboards De-Nailed Ready to be Screwed Down
-
2.6 Tools Secure and Not Accessible by The General Public (Stanley Knives have been removed from site)
-
2.7 Before leaving the properties (where possible) the occupants have had a full and detailed explanation of how the system works and he works completed and why
3.0 BS 7671 COMPLIANCE
-
3.1 RCD Protection Installed (Any cables buried less than 50mm under the surface of the plaster MUST have RCD Protection)
-
3.2 Where RCD has not been installed Please Confirm Additional Mechanical Protection has been provided I.e. Trunking or Conduit
-
3.3 Confirmation That All Gas and Water Bonds are of a sufficient Size to Comply With Current Wiring Regulations<br>(The main bonding conductor must be 6.0mm minimum - if it is less than his size a new conductor is required 10.0mm)
-
3.4 Confirmation that wiring in Bathrooms are in the Correct Zones (IP Rated or SELV) Installed as Required
4.0 SITE PROGRESS
-
4.1 All Works On Program
5.0 ACCESS ISSUES
-
5.1 Have You Experienced Issues with gaining Access
6.0 DELAYS
-
6.1 Have You Experienced any Delays
7.0 QUALITY ON SITE
-
7.1 Weekly Tool Box Talk Completed (Please give a brief description of the topic discussed)
-
7.2 All Staff in Full Uniform
-
7.3 Properties are clean and tidy upon completion
-
7.4 Adequate Floor Protection In Use
-
7.5 Are appliance protectors being used
-
7.6 Blue Over Shoes in Use (Where Floor Protection is Not Available)
8.0 AUDIT CARRIED OUT BY
-
Signed
-
Select date