Title Page

  • Site conducted

  • FOR THE MONTH OF:

  • Date:

  • Unit Number:

  • Machine Type:

  • Completed By:

  • Signature

CHASIS

  • NO VISUAL CRACKS/DEFORMATION/CORROSION

  • INSPECT MOUNTING BRACKETS

  • INSPECT FOR MISSING/LOOSE BOLT FIXATION

PTO / HYDRAULIC MOTORS

  • NO VISUAL CRACKS/DEFORMATION/CORROSION

  • INSPECT FOR MISSING/LOOSE BOLT FIXATION

  • INSPECT FOR OIL LEAKS

OUTRIGGERS

  • FUNCTION TEST

  • INSPECT FOR OIL LEAKS

  • ALL OUTRIGGER SAFETY LOCKS IN PLACE

  • NO VISUAL CRACKS/DEFORMATION/CORROSION

SUB STRUCTURE

  • INSPECT BOOM CRADLE AND SUPPORT FRAME

  • NO VISUAL CRACKS/DEFORMATION/CORROSION

  • INSPECT CHASSIS PIPING FIXATION

  • INSPECT FOR OIL LEAKS ON TANK/HOSES/FITTINGS

MAIN STRUCTURE

  • NO VISUAL CRACKS/DEFORMATION/CORROSION

  • INSPECT BUSHES FOR WEAR

TURNING SYSTEM

  • INSPECT PIN AND BUSH FOR EXCESSIVE WEAR

  • INSPECT HYDRAULIC HOSES

  • INSPECT HYD MOTOR/SLEW RACK FOR OIL LEAKS

  • CHECK SLEW LIMIT SWITCH IS OPERATIONAL

  • CHECK ONE SIDE SUPPORT (OSS) IS OPERATIONAL

  • INSPECT SLEW BOLTS (if applicable)

  • NO VISUAL CRACKS/DEFORMATION/CORROSION

BOOM ASSEMBLY

  • INSPECT SADDLE/REINFORCING PLATES FOR CRACKS/DEFORMATION/CORROSION

  • CHECK BOOM SECTIONS ARE SITTING CORRECTLY

BOOM GREASING

  • WAS THE BOOM GREASED AT TIME OF INSPECTION

  • WERE ALL GREASE NIPPLES ACCEPTING GREASE

STAGE 1

  • NO VISUAL CRACKS ON BOOM SECTION

  • NO VISUAL CRACKS ON PIPELINE SUPPORT BRACKETS

  • PIPE SUPPORT CLAMPS SECURE

  • NO VISUAL LEAKS ON HYDRAULIC CYLINDER

  • NO VISUAL LEAKS ON HYD HOSES/PLUMBING

  • INSPECT ALL LOCKING PLATES, PINS AND NUTS

  • ALL SAFETY PINS IN PLACE

STAGE 2

  • NO VISUAL CRACKS ON BOOM SECTION

  • NO VISUAL CRACKS ON PIPELINE SUPPORT BRACKETS

  • PIPE SUPPORT CLAMPS SECURE

  • NO VISUAL LEAKS ON HYDRAULIC CYLINDER

  • NO VISUAL LEAKS ON HYD HOSES/PLUMBING

  • INSPECT ALL LOCKING PLATES, PINS AND NUTS

  • ALL SAFETY PINS IN PLACE

STAGE 3

  • NO VISUAL CRACKS ON BOOM SECTION

  • NO VISUAL CRACKS ON PIPELINE SUPPORT BRACKETS

  • PIPE SUPPORT CLAMPS SECURE

  • NO VISUAL LEAKS ON HYDRAULIC CYLINDER

  • NO VISUAL LEAKS ON HYD HOSES/PLUMBING

  • INSPECT ALL LOCKING PLATES, PINS AND NUTS

  • ALL SAFETY PINS IN PLACE

STAGE 4

  • NO VISUAL CRACKS ON BOOM SECTION

  • NO VISUAL CRACKS ON PIPELINE SUPPORT BRACKETS

  • PIPE SUPPORT CLAMPS SECURE

  • NO VISUAL LEAKS ON HYDRAULIC CYLINDER

  • NO VISUAL LEAKS ON HYD HOSES/PLUMBING

  • INSPECT ALL LOCKING PLATES, PINS AND NUTS

  • ALL SAFETY PINS IN PLACE

STAGE 5

  • NO VISUAL CRACKS ON BOOM SECTION

  • NO VISUAL CRACKS ON PIPELINE SUPPORT BRACKETS

  • PIPE SUPPORT CLAMPS SECURE

  • NO VISUAL LEAKS ON HYDRAULIC CYLINDER

  • NO VISUAL LEAKS ON HYD HOSES/PLUMBING

  • INSPECT ALL LOCKING PLATES, PINS AND NUTS

  • ALL SAFETY PINS IN PLACE

PHOTO

  • PHOTOS

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.