Title Page

  • Contractor

  • Job / Site Details

  • Climbing Crew

  • Date

THIS CHECKLIST MUST BE COMPLETED PRIOR TO CLIMB COMMENCING

Tasks to be completed

  • Penetration size correct as per drawings

  • Penetration plumb with other penetrations and as per drawings

  • Penetration formwork stripped

  • Propping installed as per drawings

  • Competent persons assigned to complete boom climb

  • Concrete is up to required strength as per placing boom engineered drawings before boom climb

  • Frames and hydraulic jacks at the correct levels

  • Tower ladders accessible on site

  • Workers on site and Crane crew aware that placing boom climb is taking place

  • Exclusion zones established

  • Power lead has sufficient length for climb / Power Isolation board at correct level

  • Power lead secured and protected from pinching points during climb

  • Placing boom climbing pendant and hydraulic hoses have sufficient length for climb

  • Temporary penetration coverings ready to cover penetrations when they become exposed

  • Check wind speed is within allowable speed as per manufacturer's specifications

  • Placing boom mast pipeline disconnected prior to climb

  • Check tower has clear pathway vertically so nothing can stop the tower climbing

  • Ensure boom package is at correct alignment and orientation

  • Comments:

Completed by

  • Employee Name

  • Signature

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.