Title Page
-
Contractor
-
Job / Site Details
-
Climbing Crew
-
Date
THIS CHECKLIST MUST BE COMPLETED PRIOR TO CLIMB COMMENCING
Tasks to be completed
-
Penetration size correct as per drawings
-
Penetration plumb with other penetrations and as per drawings
-
Penetration formwork stripped
-
Propping installed as per drawings
-
Competent persons assigned to complete boom climb
-
Concrete is up to required strength as per placing boom engineered drawings before boom climb
-
Frames and hydraulic jacks at the correct levels
-
Tower ladders accessible on site
-
Workers on site and Crane crew aware that placing boom climb is taking place
-
Exclusion zones established
-
Power lead has sufficient length for climb / Power Isolation board at correct level
-
Power lead secured and protected from pinching points during climb
-
Placing boom climbing pendant and hydraulic hoses have sufficient length for climb
-
Temporary penetration coverings ready to cover penetrations when they become exposed
-
Check wind speed is within allowable speed as per manufacturer's specifications
-
Placing boom mast pipeline disconnected prior to climb
-
Check tower has clear pathway vertically so nothing can stop the tower climbing
-
Ensure boom package is at correct alignment and orientation
-
Comments:
Completed by
-
Employee Name
-
Signature
-
Date