Title Page
-
Scheme Name
-
Conducted on
-
Prepared by
-
Has the Fire Alarm been tested and passed?
-
Location of call point tested (if applicable)
-
Do the automatic doors 'fail to safe'?
-
Has the smoke ventilation system been tested and passed?
-
Is the normal task lighting working?
-
Are all escape routes clear?
-
Has all water flushing been carried out and passed?
-
Record Fridge Temperature (detail actions if not below 5 Degrees Celsius)
-
Record Freezer Temperature (detail actions if not at or below -18 Degrees Celsius)
-
Are any changes needed to PEEPs? Do not reference customer names.
-
Details/Actions if Applicable
-
Are any changes needed to the scheme key audit?
-
Details/Actions if Applicable
-
Are there any other items requiring action as a result of today's weekly testing?<br>
-
Completed and Signed by: