Compressor Current working Hour
Check List
-
General Maintenance/Cleaning of air dryer as per manual (Quarterly)
-
Check Normal Functioning of Air Dryer (Quarterly)
-
Cleaning of air dryer (quarterly)
-
Check Normal Functioning of drain valves (Air Dryer & Filter) (Quarterly)
-
Cleaning of Condensate drain valve (quarterly)
-
Cleaning of Condensate drain valve in Air receiver (Quarterly)
-
Cleaning of Electronic drain valve in Pre-Filter (Quarterly)
-
Cleaning of Muffler/Silencers (Quarterly)
-
Remove dirt from the strainer (Quarterly)
-
Check Wiring and Piping for Loose Connections (Quarterly)
-
Check physical condition of pipes (Quarterly)
Check List Page 2/3
-
Check Piping Leaks (Quarterly)
-
Check for Leakage in overall Plant (Quarterly)
-
Record Air Tank pressure in bar (Quarterly)
-
Check the compressor pressure (Quarterly)
-
Check pressure at the receiver (Quarterly)
-
Check the safety relief valve on the tank installed in high pressure line (Quarterly)
-
Check Voltage Fluctuation in Power Panel (Quarterly)
-
Check Voltage on the Power Panel (Quarterly)
-
Check Molecular Sieve Level (Quarterly)
-
Verify Open-Condition of Ball (Quarterly)
-
Verify Alarm functioning at Low Oxygen Purity and pressure (Quarterly)
Check List Page 3/3
-
Calibration of Oxygen Sensor (every 6months)
-
Replacement of Pre-Filter cartridge (if and when required)
-
Replacement of pressure gauges (if and when required)
-
Replacement of Fine-Filter cartridge (if and when required)
-
Replacement of After-Filter cartridge (if and when required)
-
Replacement of Carbon-Filter cartridge (if and when required)
-
Replacement of Pressure safety valves (if and when required)
-
Replacement of Solenoid Directional Control valve (if and when required)
-
Replacement of Angle seated valves (if and when required)
-
Replacement of Pressure regulator (if and when required)
-
Engineer's Observation