Title Page
-
Project Name
-
Conducted on
-
Prepared by
-
Location
Previous Report Action
-
Has the Previous Report Actions Been Closed Out ?
-
Have All Issues been Cleared By Main Contractor ?
Documentation Review
-
Risk Assessment Method Statement
-
Friday Pack Submission to Main Contractor
-
Toolbox Talks
-
Access Equipment Inspection / Register
-
PUWER ( Provision and Use of Work Equipment Regulations ) Inspection / Register
-
LOLER ( Lifting operations and Lifting Equipment Regulations 1998 ) Inspection / Register
-
Daily Activity Briefing
-
Permit to Work
-
All Operatives Inducted to site
-
Competencies / CSCS / Skill cards
-
Temporary Works Register
Site Operations
-
Fall Protection in Place
-
Are All Operatives Waering PPE as per Site Rules and RA/MS ?
-
Are Works Being Carried Out as per RA/MS ?
-
Housekeeping Around the Working Areas
-
Are Permits to Work in Place ?
-
COSHH Management ?
-
Waste Management ?
-
Are All Hops Ups / Podiums Inspected and in Good Condition ?
-
Are Exclusion Zones Required and in Place ?
-
Are All tools PAT Tested?
-
Is Dust managed and Suitable PPE worn ?
-
Working at Height Operations
-
Material Storage Area Management
-
Manual Handling Operations and SSOW
Main Contractor Site
-
Is Suitable Welfare in Place
-
Is the Site well Managed ?
-
Are pedestrian Walkways in Place and Segregated from Moving Plant / Vehicles ?
-
Are Walkways Clear from Obstructions
-
Are Pedestrian routes well lit ?
-
Do the Site have Sufficient Emergency Signage in Place ?
-
Is Site traffic well managed with Exclusion Zones ?
-
Are Daily Activity Briefing held to Coordinate Sub Contractors on Site ?
-
Is the Health and Safety Board Updated?
-
Has the Emergency Procedures been Communicated to ALL Operatives ?
Summary
-
Brief Summary