SST019

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Information required

  • Risk Assessment & Method Statement Evaluation

  • Description of works to be undertaken with sequence

  • Risks (including loading/unloading) identified, minimised and controlled

  • Controls to safeguard third parties and the public

  • Controls relevant to the work

  • Safe access, egress and work location

  • COSHH assessments for the work with controls and PPE

  • Manual Handling assessments relevant to the work

  • Noise assessments relevant to the work

  • Vibration assessments relevant to the work

  • Permit to work requirements

  • Lifting Plan requirements

  • Asbestos identified and relevant protection in place

  • Temporary works considered and designed

  • Supervisors name and competency

  • Competency certificates included and valid for duration

  • Schedule of plant and equipment to be used (including certificates)

  • Minimum PPE requirements

  • Emergency Procedure (including 1st Aid)

  • Response Plan / Arrangements

  • Method of induction of operatives into the RA/MS

  • Method of identifying and isolating services

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.