Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Signed by

  • Location

GENERAL

  • IS THER ASBESTOS PRESENT IN YOUR WORK AREA

  • Have you read the asbestos report and shared with your team.

  • If there is no risk assessment have you evaluated that your products are free from asbestos

  • Are all members of your team safe to work.

RISK ASSESSMENT AND METHOD STATEMENT

  • Does the scope of work correspond with the plan of works.

  • Are there job specific hazards not identified by the risk assessment.

  • Do your team members have the correct level of PPE.

  • Does your standard PPE kit cover the scope of works required.

  • Have you considered the safety of others because of the scope of works.

  • Add additional concerns not covered by RAMS provided.

  • undefined

SAFETY OF OTHERS

  • Does the project require gates, hoarding or fencing.

  • Is there scaffolding in place on a public highway.

  • Is signage required to redirect pedestrians.

  • Are the safety measures in place adequate.

  • Are clients and members of the public safe from the affects of work we are carrying out.

  • Are further safety measures required.

WORK AT HEIGHT

  • Is there a fixed scaffold in place at this task.

  • Does the Scaff Tag indicate the scaffold is complete and safe to work.

  • Does the scaffold require alterations.

  • Is the scaffold designed to keep you safe through the scope of works.

  • Are all of your drop off points protected with handrails.

  • Is your work platform free from trip hazards.

  • Is the scope of work affected by adverse weather conditions.

  • is the scope of work covered by the RAMS provided for this task.

  • ADD additional concerns not covered by RAMS supplied

STAFF SAFETY

  • Are staff wearing minimum level of PPE - Hi Vis - Hard Hats - Safety Boots - Gloves.

  • Are there first aid kits available on site.

  • Are there adequate welfare facilities on site.

  • Are there eye wash facilities on site.

  • Are noise levels safe on site.

  • Is the site tidy and clear from rubbish and debris.

  • Have further levels of PPE been dynamically assessed.

TOOL SAFETY

  • Are corded power tools being used on site.

  • Have the power tools been PAT tested.

  • Are power leads being run above head height.

  • Are power tools 110v or 240v

  • Are residual circuit breakers being used.

  • Are tools on site safe to use.

  • Are tools being used fit for purpose.

GENERAL SAFETY ASSESSMENT OF SITE

  • How would you rate the overall safety of this project

  • Could further control measures improve the site Safety

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.