Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 DAILY CLEANING SCHEDULE
-
1.1 CINELLI-ESPERIA MULTI-ROLLER
-
1.2 DIES
-
1.3 CROSS-SHEETER (EXTERIOR AND BELT)
-
1.4 BOWL MIXER #1, 2, 3
-
1.5 DIVIDERS # 1, 2, 3, 4, 5
-
1.6 ROUNDERS # 1, 2, 3, 4, 5, 6
-
1.7 BREAD (BAGUETTE) MOULDER
-
1.8 ELEVATOR (HOIST) + DUMPER
-
1.9 SUPER SIX MACHINE
-
1.10 BASKET PROOFER & HANDLES (EXTERIOR)
-
1.11 ALL STAINLESS STEEL TABLE
-
1.12 SIFTER AND FLOUR SHUTE (EXTERIOR)
-
1.13 TOP OF WATER TREATMENT INSTRUMENT
-
1.14 WATER HEATER
-
1.15 UNDER OIL BINS
-
1.16 WALLS IN MIXING AREA
-
1.17 TOP OF WHITE BINS
-
1.18 BLUE LADDER
-
1.19 ALL FLOORS IN THE PLANT
-
1.20 CEMENT BASE OF BLAST FREEZERS #1, 2, 3
-
1.21 DOORS & HANDLES OF ALL FREEZERS
-
1.22 WALK-IN PROOFER (FLOOR & HANDLES)
-
1.23 STORAGE COOLER (SWEEPING)
-
1.24 STORAGE COOLER HANDLES & DOOR
-
1.25 UV LIGHT
-
1.26 STORAGE FREEZER (SWEEPING)
-
1.27 CLEANING TOOLS
-
1.28 METAL DETECTORS (CINELLI)
-
1.29 METAL DETECTORS (FORTRESS)
-
1.30 SINKS # 1, 2, 3
-
1.31 GARBAGE CONTAINERS
-
1.32 DOORS
2.0 WEEKLY CLEANING
-
2.1 ALL WALLS TO 5 FEET
-
2.2 SEQUENTIAL OVENS (OUTSIDE / CONVEYOR / EXHAUST)
-
2.3 WALK IN PROOFER INCLUDING ROOF
-
2.4 BLAST FREEZER #2, 3 INCLUDING ROOF BLAST
-
2.5 FREEZER #1 WHEN OFF
-
2.6 ROOF OF BLAST FREEZER #1
-
2.7 ROOF OF COLD STORAGE
-
2.8 ROOF OF STORAGE COOLER
-
2.9 FLOORS OF NEW PLANT TWICE PER WEEK
3.0 MONTHLY DEEP CLEANING
-
3.1 CINELLI EXPERIA MULTI ROLLER
-
3.2 CROSS SHEETER LINE
-
3.3 BOWL MIXERS # 2, 5
-
3.4 DIVIDERS # 1, 2, 3, 4, 5
-
3.5 ELEVATOR (HOIST)
-
3.6 SUPER SIX MACHINE
-
3.7 BREAD (BAGUETTE) MOULDER
-
3.8 OVERHEAD (BASKET) PROOFER
-
3.9 METAL DETECTOR (CINELLI)
-
3.10 METAL DETECTOR (FORTRESS)
-
3.11 ROUNDERS # 1, 2, 3, 4, 5, 6
-
NOTES:
-
CLIENT SIGNATURE:
-
PCI SUPERVISOR SIGNATURE: