Title Page
-
Closure Inspection:
-
Document No.
-
Client / Site
-
Job Number:
-
Conducted on
-
Prepared by
-
Location/Area of Inspection
-
-
Attendees
Closure Inspection
-
Does the area being closed conform to the Contract Documents?
-
If not, is re-inspection by PAC acceptable for approval?
-
Pictures
-
Acceptance Signatures:
-
Add signature
-
Add signature
-
Add signature
-
Add signature