Concrete Placement

  • Have all dimension been checked against the contract drawings and RFI's that pertain to this area?

  • Has all rebar and wire mesh been checked against shop drawings?

  • Have adequate supports (wire chairs) been installed so that rebar and wire mesh remain in position during the pour?

  • Have anchor bolts been checked for proper placement?

  • Are forms and rebar/mesh clean and free of debris/rust/scaling ?

  • Is the correct concrete being supplied for the area being poured?

  • Pictures

  • Acceptance Signatures:

  • Add signature

  • Add signature

  • Add signature

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. Any ratings or scores displayed in our Public Library have not been verified by SafetyCulture for accuracy. Users of our platform may provide a rating or score that is incorrect or misleading. You should independently determine whether the template is suitable for your circumstances. You can use our Public Library to search based on criteria such as industry and subject matter. Search results are based on their relevance to your search and other criteria. We may feature checklists based on subject matters we think may be of interest to our customers.