Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Date and time of audit

AUDIT CONDITIONS

  • Select any that apply

  • Sunny

  • Cloud

  • Showers

  • Rain

  • Wind

STATION SPECIFIC CLEANING TASKS

Item 1.0 Platform

  • Frequency = as required

  • 1.1 Platform shall be swept, with the collected material being removed from site and dispersed of by the contractor at an authorised territorial authority refuse centre

  • 1.2 Wads of gum, fluid spills and all other sticky substances shall be removed from the area.

  • 1.3 Handrails, joinery, warning signs, guards and other metal surfaces shall be cleaned and polished.

  • 1.4 Seating shall be wiped down and left in a dry state.

  • 1.5 Grates and channels shall be maintained free of debris and litter

  • 1.6 Graffiti and stickers must be removed.

  • 1.7 Vegetation growing through platform cracks etc must be removed.

  • 1.8 Loose rubbish is to be collected, and disposed of by the contractor at an authorised territorial authority refuse centre. Items such as cans, glass and plastics are to be sorted and recycled

Item 2.0 Access-way.

  • Frequency = As required

  • 2.1 Access way to be swept and free of dirt and debris, animal faeces, leaves, litter and twigs Access way to be kept free of weeds, moss, mould, lichen etc.

  • 2.2 Wads of gum, fluid spills and all other sticky substances shall be removed from the area.

  • 2.3 Barrier panels handrails and mesh shall be clean and free of dirt, streaks and spots

3.0 Exterior Wall Cleaning

  • Frequency = As required

  • 3.1 There shall be no streaks, fluid splashes or spots remaining on walls or signs.

  • 3.2 There shall be no smudges or spots at points where cleaning of the lower and upper halves of the walls overlap.

  • 3.3 Walls shall be uniformly clean all over.

  • 3.4 Woodwork on doors, windows and mouldings shall be clean.

  • 3.5 Glass surfaces shall be clean and free of any smudges, finger marks and dirt.

Item 4.0 Staff toilets located within the building

  • TOILET CLEANING/FLOOR CLEANING - Daily PM

  • 4.1 Rubbish containers shall be emptied and have clean liners inserted.

  • 4.2 No rubbish shall be on the floor.

  • 4.3 All rubbish shall be removed from site and disposed of by the contractor at an authorised territorial authority refuse centre.

  • REPLENISHMENT OF SUPPLIES

  • 4.4 All dispensers of supplies shall be clean and filled with the proper supplies (towels, soap, etc.)

  • CLEANING OF SANITARY RECEPTACLES.

  • 4.5 All sanitary receptacles shall be clean except for a new liner.

  • 4.6 All sanitary receptacles shall be free of spots, stains and finger marks.

  • 4.7 All sanitary receptacles shall be free of odours

  • CLEANING OF TOILET CUBICLE FIXTURES

  • 4.8 All porcelain surfaces of washbasins, toilets and urinals shall be free of dust, dirt, spots and stains.

  • 4.9 The surfaces will be free of spots and smears.

  • 4.10 All toilet seats shall be left in the raised position after cleaning. They shall be free of spots and stains and the seat hinges shall be free of mould.

  • 4.11 The plumbing fixtures shall be free of spots, smears, mould and water stains.

  • 4.12 Urinals shall not have an excessive build-up of toilet blocks/cakes in them.

  • CLEANING OF SUPPLY DISPENSERS, STALL PARTITIONS DOORS, SHELVES, MIRRORS AND FLOORS

  • 4.13 All supply dispensers shall be clean and free of finger marks, graffiti and water spots.

  • 4.14 All shelves and shelve brackets shall be free of gum, dust, fingerprints, water stains, smudges and other soil.

  • 4.15 All mirrors shall be free of streaks, smudges, water spots, dust, lipstick smudges,water streaks and should not be cloudy or smeared.

  • 4.16 Walls, stall partitions and doors shall be free of hand marks, dust, pencil marks, lipstick smudges, water streaks, mop marks and mould.

  • 4.17 Floors (especially in the corners) shall be free of dirt, dust, gum, grease, black marks, loose paper, water or mop stains, and strings. Particular attention should be given to areas under urinals, toilet bowls and seats.

Item 6.0 Staff area cleaning.

  • 6.1 There shall be no streaks, fluid splashes or spots remaining on walls or signs.

  • 6.2 There shall be no smudges or spots at points where cleaning of the lower and upper halves of the walls overlap.

  • 6.3 Wall shall be uniformly clean all over.

  • 6.4 Woodwork on doors, windows, and mouldings shall be clean.

  • 6.5 Glass surfaces shall be clean and free of any smudges, finger marks and dirt.

Item 7.0 Kiosk and waiting room (only when Open)

  • CONTRACTOR TO OPEN AND CLOSE WAITING ROOM FROM 6am – 11am DURING WINTER MONTHS 1ST MONDAY IN JUNE TO LAST MONDAY IN AUGUST UNLESS OTHERWISE INSTRUCTED BY GWRL

  • 7.1 The mopping work shall have been performed in such manner as to properly clean the floor surface. Proper extraction methods shall be used to eliminate residue build-up in seams and discolouring of grout.

  • 7.2 All mopped areas shall be clean and free from dirt, streaks, mop marks, and strands, etc.; properly rinsed, if required, and dry mopped for an overall appearance of cleanliness.

  • 7.3 Joinery, warning signs, knobs, handles, guards and other metal surfaces shall be cleaned and polished.

  • 7.4 Wall surfaces up to a height of 2.0m shall be free of finger marks, smudges, and other dirt spots of any kinds.

  • 7.5 Glass surfaces shall be clean and free of any smudges, finger marks and dirt.

  • 7.6 Seating shall be wiped down and left in a dry state.

  • 7.7 Graffiti and stickers must be removed.

  • 7.8 Both interior and exterior wall surfaces will be free of spots and smears.

Item 8.0 Staff area cleaning.

  • 8.1 Remove loose paper and other rubbish.

  • 8.2 Vacuum clean including corners, edges, stairs and under/behind furniture.

  • 8.3 All mopped areas shall be clean and free from dirt, streaks, mop marks, and strands, etc.; properly rinsed, if required, and dry mopped for an overall appearance of cleanliness.

  • 8.4 Toilets and showers in staff areas are to be clean and free from dirt and streaks for an overall appearance of cleanliness.

  • 8.5 Joinery, warning signs, knobs, handles, guards and other metal surfaces shall be cleaned and polished.

  • 8.6 Wall surfaces up to a height of 2.0 m shall be free of fingers marks, smudges and other dirt spots of any kind.

  • 8.7 Glass surfaces shall be clean and free of any smudges, finger marks and dirt.

  • 8.8 Seating shall be wiped down and left in a dry state.

  • 8.9 Graffiti stickers must be removed.

  • 8.10 Both interior and exterior wall surfaces will be free of spots and smears.

  • 8.11 Signs and poster boards shall be wiped down so that there are no finger marks, smudges and other dirt spots of any kind.

  • 8.12 Stickers and graffiti, wads of gum, fluid spills and all other sticky substances shall be removed.

Item 9.0 Signage (including posters, timetables etc.)

  • Frequency = as required

  • 9.1 Signs and poster boards shall be wiped down so that there are no finger marks, smudges, and other dirt spots of any kind.

  • 9.2 Stickers and wads of gum, fluid spills and all other sticky substances shall be removed.

Item 10.0 Cycle lockers (double box) x 2

  • Frequency = as required unless otherwise stated.

  • 10.1 There shall be no streaks or spots remaining on surfaces or signs.

  • 10.2 They shall be uniformly clean all over.

  • 10.3 Graffiti, gum, fluid spills and all stickers must be removed.

  • 10.4 Metal surfaces shall be cleaned and polished.

  • 10.5 Locks and other fittings to be washed down and polished.

  • 10.6 Litter is to be collected and then removed fro site by the contractor at an authorised territorial authority refuse centre.

  • 10.7 A full wash down of the cycle boxes shall occur not less than once per month. - AT LEAST MONTHLY

  • 10.8 Annual maintenance – all items above 10.1 – 10.7 plus Clean internal locker, lubricate all moving parts. Clean lubricate lock. Check door alignment and locker mount. Check correct number labelling. Log items (or empty) in each locker and report. Carry out any minor repairs, report major requirements for action.

Item 11.0 Graffiti removal not exceeding 0.130m2 (A3 page size) and reporting

  • Frequency = Each visit

  • 11.1 All areas within the highlighted areas on the Station-specific Specification plans must monitored for graffiti.<br>Any graffiti not exceeding 0.130m2 (A3 page size) which is identified must be removed immediately.<br>Statistics on how much graffiti of this size, which was located over the month for each station must be supplied to KiwiRail’s security manager monthly. This information must also be provided to GWRL as part of the monthly report and on a GWRL accessible system allowing instant retrieval to ensure payment.

OTHER TASKS

Item 1.0 lighting

  • Frequency = as required

  • 1.1 Lights to be repaired/replaced within the following time frames<br> Platform lights - 24 hrs from time of fault ID<br> Security lights - 24 hrs from time of fault ID<br> Internal lights - 48 hrs from time of fault ID

Item 2.0 Rail corridor cleaning

  • Frequency = Monthly

  • 2.1 Rail corridor to have a walkover litter collection for the length of the platform only, with the collected material being removed from site and disposed of by the contractor at an authorised territorial authority refuse centre, items such ax cans, glass and plastics are to be sorted and recycled.

Item 3.0 Minor maintenance and damage reporting.

  • Frequency = Each visit

  • 3.1 Check for and report all signs of degradation or damage to GWRL. Where damage constituting works less than $500 is identified it shall be reported to GWRL immediately with a quote for repair. The repair must work must only be undertaken after written confirmation from GWRL.<br>Damage above this value must be reported to GWRL with a quote for repair. GWRL may either refer this work back to the Contractor subject to agreement on price or award the work to a party outside of this contract.<br>Where damage which presents a risk to public or personal safety is identified, the Contractor is to temporarily make safe the area and notify GWRL immediately.<br>All damage shall be photographed prior to repair.<br>Photographs of all completed works and monthly report must be provided to GWRL with the invoice to ensure payment.

Item 4.0 Graffiti removal exceeding 0.130m2 (A3 page size) and reporting.

  • Frequency = Each visit

  • 4.1 All areas within the highlighted areas on the Station-specific Specification plans must monitored for graffiti.<br>Any graffiti exceeding 0.130m2 (A3 page size) but not exceeding 2.0m2 must be photographed with clear and readable measure in the photo before being removed.<br>Any graffiti exceeding 2.0m2 shall be photographed with clear and readable measure in the photo. The photo is to be emailed to GWRL within 24 hours with a quote for its removal (this quote must be inclusive of labour and materials). GWRL may either refer the removal work back to the Contractor subject to agreement on price or award the work to a party outside of this contract.<br>The photos and the statistics on how much graffiti that was located over the month for each station is to be supplied to KiwiRail’s security manager on a monthly basis. This information must also be provided to GWRL as part of the monthly report and on a GWRL accessible system allowing instant retrieval to ensure payment. The information should be separated into the size brackets indicated on the schedule of prices.

Item 5.0 Low frequency tasks

  • Frequencies as indicated on each item

  • 5.1 Wash down soffit (ceiling underside of roof) using light detergent, water and a soft broom. 2 Monthly

  • 5.2 Clean out and dispose of debris from the internal roof guttering on the shelter 6 Monthly

  • 5.3 Fully wash down shelters inside and out including ceilings, internal surfaces, walls and ledges/slots using light detergent, water and a soft broom. 2 Monthly

  • 5.3 Fully wash down shelters inside and out including ceilings, internal surfaces, walls and ledges/slots using light detergent, water and a soft broom. 2 Monthly

  • 5.4 CCTV cameras/domes and lenses to be cleaned where possible

  • 5.5 Provisional items as instructed

PERFORMANCE INCENTIVES

  • Non Conformance Items Present during the audit?

  • Great work - no contract deductions applicable.

  • Contract deduction of $400 - deduction to take effect on invoice and report for month following this audit

  • Contract deduction of $600 - deduction to take effect on invoice and report for month following this audit

  • Contract deduction of $1200 - deduction to take effect on invoice and report for month following this audit

  • Contract deduction of $2200 - deduction to take effect on invoice and report for month following this audit

  • General Comments

  • SRL representative Signature

  • Auditors Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.