Acceptance of Room/Area
-
Is Tape and Jointing carried out to a satisfactory standard?
-
Is making good carried out to a satisfactory standard?
-
Has protection been installed to FFE
-
Has all timber work been filled and made good?
-
Has all timber work been sanded in preparation for painting?
-
Has walls and ceilings received a coat of sealer?
-
Has the first coat of paint been applied to the walls and ceiling adequately?
-
Has sufficient drying time been allowed?
-
Has the second coat of paint been applied to the walls and ceiling adequately?
-
Has the third coat of paint been applied to the walls and ceiling adequately?
Next Page
-
Has all painting to timber work been carried out to the satisfacatory standard?
-
Has all protection been removed?
-
Has all waist been removed and area left clean and tidy?