Title Page

  • ID

  • Site

  • Project No

  • Floor

  • Building

  • Zone

  • Date of inspection

  • 1.<br>Installation of the EWI Brickslip system is as per ALIVA technical specifications.

  • 2.<br>Pointing mortar, the right colour, and applied smoothly and all the gaps are filled properly.

  • 3.<br>The setting out of the brickslips is as per ALIVA technical specifications.

  • 4.<br>All horizontal lines are good with no deviation detected.

  • 5.<br>All perps are centered and half brick cuts to the edges have been installed on a consistent basis.

  • 6.<br>The brickslips to the window edge have been cut with a clean straight line

  • 7.<br>Window sills are installed as per specification, the right number of brackets, and insulation under the sill is present.

  • 8.<br>All the infills to areas where the mast fixing points were have been closed up correctly.

  • 9.<br>Mastic is applied between the windows and the sills.

  • 10.<br>The facade has been cleanead and washed.

  • 11.<br>Areas left clean and tidy in readiness for client handover.

Comments

  • undefined

Additional Photos

  • Add media

Confirmation

  • Inspection I confirm that the installation has been carried out in accordance with Aliva's technical specifications guidelines (Name and Signature of Installer Supervisor).

  • Site Agent I confirm that the works have been carried out to a satisfactory standard and all defects highlighted have been closed out.

undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.