Title Page
-
Site Name
-
Client
-
Conducted on
-
Project Number
-
Prepared by
-
Brief scope of works
-
Location
-
Site Contact (i.e. Centre management contact)
-
Email address
-
Phone number
-
Site opening hours (if on nights or in shopping centre)
-
Monday
-
Tuesday
-
Wednesday
-
Thursday
-
Friday
-
Saturday
-
Sunday
CDM Checklist
-
Is site level access / DDA compliant (incl. narrow doors)
-
What is the issue
-
Delivery / access restrictions
-
What are restrictions
-
Proposed muster point location
-
Neighbors/tenants to unit
-
LHS
-
RHS
-
Above unit
-
Rear of unit
-
Is parking available on site
-
Where can you park
-
Site compound area required
-
How many lin. m of Heras fencing
-
How many lin. m of chapter 8 barriers
-
How many lin m of hoarding required
-
Is a external WC setup required?
-
Is a external office setup required
-
Can a skip be located - if so; where?
-
Where can this be positioned
-
Any vehicle / weight restrictions for deliveries
-
What are the restrictions
-
Are inductions required to access site
-
Where to attend induction
-
Any induction time restrictions
-
Can Thompson's SM do induction and induct all other operatives
-
Existing perimeter wall construction to property
-
Existing shop front specification (i.e. aluminium glazing)
-
Does site appear to be a security risk throughout works (i.e. is manned security required)
-
Is any existing painted windows being refurbished that may contain lead paint
-
Any evidence of pest control issues / cleaning required?
-
Evidence of any needles that require cleaning
-
Location of needles to be cleaned up
-
Roofing specification (i.e. slate, flat roof)
-
Are any repairs evident
-
If so; quantity to replace m2
-
Do gutters need replacing
-
Specification of guttering and downpipes
-
Lin m of guttering
-
Lin m of downpipes
-
Is a fixed scaffold required
-
Width of scaffold (m)
-
Height of scaffold (m)
-
Does it require a loading bay for materials?
-
Will a scaffold be over (6 stories high) - if so; fan will be required
-
Will monoflex be required
-
Will yellow foam standards be required or a timber hoarding to scaffold
-
Will interim adjustments likely be required to scaffold throughout (i.e for decoration works)
-
Does the basement (if any) protrude under the pavement where scaffold is to be positioned
-
Height of facade if external decoration,window replacements etc.. required
-
Form of high level working required if not fixed scaffold (i.e. access tower, cherry picker)
-
Any local authority / landlord noise restrictions in place
-
What are the restriction hours
-
Is a Type 3 Asbestos survey required on this site (R&D survey) - required is build Pre 2000
-
Structural soffit height (mm)
-
What is the structural soffit specification (i.e. beam and block, timber etc..)
-
Any structural alterations expected that a structural engineer input will be required
-
What elements require input
-
Are intumescent paint works required on any elements
-
Existing floor construction
-
Is strip out required
-
Structural elements required
-
Catering equipment
-
Shop front
-
Walls
-
Floors
-
Finishes
-
Manufactured items
-
Items to be retained
-
Is a basement in-situ?
-
Are drainage amendments required
-
Is a CCTV survey required
-
Floor type to be chased out (i.e. reinforced concrete)
-
Lin m of floor chases proposed (mm)
-
Invert level of nearest manhole (mm)
-
Will a new manhole be required
-
Are storage facilities on site
-
Where are these
-
What is the plan (i.e. wait and load)
-
Services in place
-
Electric - DB board location
-
Water - incoming main location
-
Water - stop tap location
-
Gas - incoming mains location
-
Gas - are cook line amendments required
-
Sprinkler - panel location
-
Sprinkler - are sprinkler alterations required
-
HVAC - panel location
-
Fire alarm - panel location
-
Intruder alarm - panel location
-
Data cabinet - current location
-
Boiler - current location
-
BT - DP location
-
Ansul system - in place currently
-
Fireman's switch - in situ
-
Are actuators and fire dampers in situ that are being retained
-
Existing DB board - do they have sufficient capacity for proposed premises
-
Current capacity
-
Proposed capacity
-
Any evident damp issues on premises
-
Problem found
-
Does a specialist survey need to happen
-
Any current works/trading planned on site that may impact proposed works
-
Any programming limitations / sequencing that we are required to adhere to
Design / layout
-
Is drawing scaled accurate - a couple of site dims required
-
How much out is it
-
Any proposed assumed long lead time items
-
What items
-
Is all items proposed achievable
-
What isn't achievable?
-
Is there any critical dimensions required for manufacturing
-
What item
-
Dimensions (mm)
-
What item
-
Dimensions (mm)
-
What item
-
Dimensions (mm)
-
What item
-
Dimensions (mm)
-
What item
-
Dimensions (mm)