Title Page

  • Client

  • Project Location

  • Prepared by

  • Meeting Location
  • Date

Untitled Page

Roles and Responsibilities

  • Has direct subcontractor contact list been provided?

  • To be supplied by whom?

  • Date to be supplied by?

  • Has approval to start been granted by statutory regulators (i.e. planning, heritage, building control)

  • What is outstanding?

  • Who is dealing with this?

  • Expected dates to receive approvals by?

  • Proposed start on site date?

  • Proposed Handover date

  • Proposed programmed duration (weeks)

  • Insurance cover requirements - assumed £10,000,000 for public liability is ok?

  • What cover is required?

Site Logistics

  • Any events that are happening in the area when work is proposed that could cause issues with works progressing - i.e. streets closed for deliveries/events locally closing roads

  • Compound area proposed

  • Is an external compound area required/available?

  • Where can this be located?

  • Is tacky matting required for removing dust from feet between site and compound?

  • Any requirement to put floor protection down between compound and site

  • Are we ok to advertise with company banner on the heras fencing/hoarding?

  • Proposed working hours - 7am to 7pm - Monday to Sunday. Is this ok?

  • What hours are permitted?

  • What days are permitted?

  • Access requirements for site operatives? i.e. where to enter premises, can we have a key?

  • Security proposed for site - i.e. hoarding (fire rated or none fire rated?), manned security etc..

  • Is parking for contractors available?

  • Where can we park?

  • How many vehicles can we park?

  • Any height restrictions on vehicles?

  • What is the height restriction? (in meters)

  • Welfare facilities - are any existing available for contractor use?

  • Where are these located?

  • Welfare proposal if none available?

  • Standard PPE requirements throughout works - propose Hi-vis vest and safety boots - (hardhat, googles and gloves where required). is this ok?

  • Hi-vis vest

  • Safety boots

  • Hard hat

  • Safety Gloves (assumed cut rated 3)

  • Safety glasses

  • Delivery to site route

  • Route to site

  • Time restrictions for deliveries?

  • Height or weight restrictions for deliveries

  • Is there a delivery booking system in place?

  • Can information be supplied to email address detailed

  • Waste removal route

  • Route to remove waste

  • Restrictions on how to remove - i.e. wait and load, skips ect..

  • Skip restrictions if required - i.e. certain sizes, lockable skips etc..

  • Skip location or wait and load collection point

  • Storage of materials - anywhere out of demise that is available to help with storage of items?

  • Where can we use?

  • Crane lifts

  • What area can we utilise to carry out contract crane lift?

  • Any restrictions on date/times on crane lift to be programmed around?

Safety

  • Is there a contractors handbook that can be supplied?

  • Email address of who to chase for this?

  • Induction procedure - can site manager be inducted only and induct everyone else there after?

  • Induction day/time restrictions?

  • Do inductions need to be carried out prior to starting on site or upon arrival?

  • Any restrictions on credentials of trades being inducted - i.e. CSCS cards, ECS cards ect..

  • Fire evacuation procedure

  • Existing muster point (if any, if not; proposed muster point)

  • Is an existing Fire Alarm and/or sprinkler system in place that needs to be isolated daily?

  • Where to attend to get isolated?

  • If none in place - can we use a interconnected wireless howler system on our site?

  • Permits to work required?

  • What permits are required?

  • Where do you attend to obtain permits?

  • Is there a time restriction on when permits have to be obtained prior to works commencing?

  • Dusty works requirements - are dust extraction kits ok on tools or is completely separate segregated cutting area required?

  • Asbestos

  • Is the premises built post 2000

  • Is there a valid R&D survey in existence (6 months old max) that surveys all areas in works demise?

  • Who do we need to liaise with on access to arrange survey to be undertaken?

  • First aid, accident and emergency

  • We will have our own first aider and first aid kit on site and any RIDDOR reportable items will be dealt with accordingly - assumed this is sufficient or do you have a process in place that we need to follow on reporting incidents?

  • What do we need to do?

  • Noisy works

  • Is there any restriction on times noisy works can be carried out in?

  • What are the restrictions?

Measures

  • Existing pop up locations have been measured by Thompsons and happy with layout?

  • Any adjustments required? - if so; sketch up on plan

  • Hoarding measure - lin. meterage

  • Long lead time dimensions taken

  • Manufactured items dimensions taken

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.