Title Page
-
Site
-
Project Manager for start up will be:
-
This site is due to start on:
-
All staff to visit site and sign this page before the start date
Site visits:
-
I have visited site
Pre-Start meeting questions
-
These answers MUST be obtained by staff attending the pre-start meeting. Any outstanding information must be followed up by the Project Manager.
-
Who is leading the pre-start meeting on behalf of CRS?
-
The schedule/programme for the initial phase of works has been agreed with CRS?
-
When will a programme be determined?
-
What is the agreed start date?
-
Is there any information that may affect the site setup, from the Pre-Construction information or other?
-
What information do we have that may affect site-setup?
-
Who is responsible for the Construction Phase Plan (CPP)?
-
Who is supplying the CPP?
-
This should be sent to mark.booth@crsplant.co.uk
-
Has the F10 been created and supplied?
-
When will CRS have the F10?
-
This should be sent to mark.booth@crsplant.co.uk
-
Does Daniel Lenton (CRS) have all information regarding Water run-off, TPO, other environmental, overhead services?
-
Date agreed for this information
-
How do we get water into site?
-
How do we get electricity into site?
-
Has the client provided start/finish times and site restrictions to Mark Gladwin (CRS)
-
When will this be agreed?
-
Start/Finish times (if known):
-
Other restrictions (if known):
-
Agree who is providing the following:
-
Skip/Waste Management
- CRS
- Client
- N/A
-
Agreed date of skip arrival:
-
Vac-Ex
-
Road Sweeper
-
Jet Washer / Gateman
-
Agreed start date of Jet Washer
-
Dust suppression
-
Welfare facilities
- CRS
- Client
- Other
- Unknown
-
What is being supplied?
-
Security
-
Name and Contact details for security
-
Start date
-
Have drawings been requested for the attention of Mark Gladwin (CRS)
-
Date sent / due?
-
Is the perimeter already secured by the client?
-
Who is responsible for securing the perimeter?
-
When will the site be secured?
-
Who is supplying the fencing?
-
Is there any fencing currently on site?
-
How many panels?
Mark Booth - Health & Safety and other
-
This section should be completed by the Health & Safety Manager
-
Have the RAMS been written, printed for site and submitted to the client?
-
Has the F10 been received?
-
Is fencing required?
-
Heras panels (inc feet and clips)
-
Heras panels (panel only)
-
Ped Barriers
-
Bunting (metres, inc pins)
-
I have updated the QS regarding any required fence panels?
-
I have updated the Plant Manager regarding any required fence panels?
-
Areas identified for the following:
-
Welfare
-
Parking
-
Large Vehicle Turning area
-
Initial site supervisor or site manager has a Gold Card/SSSTS?
-
What is required
-
Who is it?
-
First Aider designated?
-
Who is it?
-
Action required
-
Is internet required?
-
Why?
-
Is the router new or redistributed?
-
From where?
-
When will it be ready for new site installation?
-
Ordered?
-
Is the router installed?
-
Date for installation
-
Plant check QR code available on-site?
-
Is a laptop and/or tablet required for site?
-
Has this been allocated?
-
Which?
-
Is a new one required?
-
Which?
- Laptop
- Tablet
-
Has this been ordered?
-
Laptop/Tablet on site?
-
Why?
-
H&S Office display ready for installation? (H&S Statement of Intent, Insurance, H&S Poster, F10, SMAS certs and other docs)
-
Date for install
-
Office display Installed?
-
A&E Location identified and displayed
-
Where
-
Policies and induction documents are printed, ready for site?
-
Policies and induction paperwork are on site?
-
Printed office registers ready to go (HAVS, PUWER, LOLER etc)?
-
Office registers are on site
-
Have the required site safety signs been displayed (PPE, Site entrance, Car Park, Pedestrians etc)?
-
Traffic management agreed with Contracts Manager and site manager?
-
Any additional signage required?
-
What is required?
-
Has the additional signage been ordered?
-
Additional signage is on site?
-
PPE checked and is available on site?
-
Water suppression provided and suitable for site/connection type?
-
Does this site require an air-powered mask?
-
Air-Powered Mask on site?
-
Smoking area designated?
-
Fire Assembly point designated?
-
Any fire extinguishers required have been ordered with the CRS Buyer?
-
Fire extinguishers on site?
-
First Aid point displayed and stocked?
-
One Drive H&S File ready for this site?
-
Action required?
Ben Foster - Materials and Buying
-
I have confirmed a delivery route to give to suppliers, considering restricted hours, school traffic etc
-
Note any relevant information
-
Are Concrete rings required?
-
How many?
-
Ordered?
-
Supplier
-
Arrival date and route agreed with supplier
-
Date and delivery area checked with site foreman?
-
Is concrete required?
-
How much?
-
Ordered?
-
Supplier
-
Arrival date and route agreed with supplier
-
Date and delivery area checked with site foreman?
-
Is tarmac required?
-
How much?
-
Ordered?
-
Supplier
-
Arrival date and route agreed with supplier
-
Date and delivery area checked with site foreman?
-
Is hardcore required?
-
How much?
-
Ordered?
-
Supplier
-
Arrival date and route agreed with supplier
-
Date and delivery area checked with site foreman?
Other Materials
-
Other materials?
-
How much?
-
Ordered?
-
Supplier
-
Arrival date and route agreed with supplier
-
Date and delivery area checked with site foreman?
-
Plant Manager is aware of the plant and lifting equipment required
-
Who is supplying fuel?
-
Ordered?
-
Delivery date?
-
Checked that fuel storage facilities will be on site
-
Drips trays and absorbent pads ordered/in stock
-
Drips trays and absorbent pads on- site?
-
Spill Kit ordered/in stock
-
Spill kit on site?
-
Oils, coolants and fluids ordered/in stock?
-
Oils, coolants and fluids on site?
-
Grease ordered/in stock?
-
Grease is on site?
-
Adequate number of grease guns and funnels ordered/in stock?
-
Grease guns and funnels on site?
-
Desks and chairs ordered/in stock
-
Desks and chairs on site?
-
Filing cabinet/drawers ordered/in stock?
-
Filing cabinets/drawers on site?
-
Key safe ordered/in stock
-
Stationary is ordered, or in stock (pens, markers, stapler, hole punch, sellotape).
-
Stationary is on site
-
Printer and paper, laminator and laminate pouches ordered for site
-
Printing and laminating is available on site
-
Blades ordered/available for Stihl Saws?
-
Saw blades are on site
-
Office, canteen and/or toilet waste bins ordered
-
Bins on site
-
Kettle, microwave, mugs ordered/in stock
-
Kitchen facilities on site
-
Water cooler and water ordered/in stock
-
Water on site
-
Site Safety sign pack ordered/in stock (Site PPE, Car Park, Site Entrance, Speed Limit etc)
-
Pedestrian route signs ordered/in stock
-
Toilet roll, blue roll, paper towels, toilet brush and basic cleaning products ordered/in stock
-
Toilet rolls and cleaning products on site as required
-
Extension leads ordered/in stock?
-
Extension leads on site
-
Are fire extinguishers required (as requested by H&S)
-
Have fire extinguishers been ordered?
-
Chapter 8 barriers or signage required for works in road?
-
How many?
-
Full amount in stock already
-
Ordered
-
Arrived on site
-
Action required?
Richard Howell - Plant, Buildings and storage facilities
-
All plant has been allocated to site? (Large and small plant, including jet wash)
-
What plant is going to site?
-
Date due?
-
All plant has arrived
-
Lifting equipment has been allocated to site?
-
What lifting equipment is going to site?
-
Date due?
-
All lifting equipment has arrived and is suitable for work required and unloading materials due?
-
A suitable storage area for large and small plant items have been identified?
-
Plant testing and LOLER certificates checked and on the system
-
Is there a suitable connection or supply of water on site for the jet wash?
-
Lasers available for site?
-
Lasers and associated equipment on site, or with engineer/operative
-
A suitable site office has been identified
-
Due date?
-
Arrived at site?
-
Suitable toilet for number of operatives on site identified
-
Due date?
-
Arrived at site?
-
Canteen with hot/cold running water and adequate seating identified
-
Due date?
-
Arrived at site?
-
Changing room / Heating / Drying Room required?
-
Changing room / Heating / Drying room ordered as required?
-
Due date?
-
Arrived at site?
-
Welfare service connections required
-
Arranged?
-
Date
-
COSHH storage arranged?
-
COSHH storage on site?
-
Diesel bowser arranged
-
Diesel bowser on site
-
Are we supplying a skip?
-
Ordered
-
Date due
-
Are we supplying Road Sweeper?
-
Ordered
-
Date due
-
Is Vac-Ex required yet?
-
Ordered
-
Date due
-
Are we supplying any ground dust suppression?
-
Ordered
-
Date due
-
Locks and chains required for site entrance gate and cabins
-
Locks and chains ordered/in stock
-
Locks and chains on site
-
Cleaner Required
-
Cleaner arranged
-
Day cleaner due
-
The H&S Manager has requested the following barriers
-
Heras panels (inc feet and clips)
-
Full amount in stock already
-
Ordered
-
Arrived on site
-
Heras panels (panel only)
-
Full amount already in stock
-
Ordered
-
Arrived on site
-
Ped Barriers
-
Full amount already in stock
-
Ordered
-
Arrived on site
-
Bunting (metres, inc pins)
-
Full amount already in stock
-
Ordered
-
Arrived on site
-
Action required?
Daniel Lenton - Technical and other
-
Drawings in hand for initial phase of works?
-
Have these been requested?
-
Due date
-
These have been shared with the relevant people
-
Any relevant geological or topographical information, ground type etc
-
This has been shared with the relevant people
-
Is there any CBR testing info received from remediators?
-
Has this been requested?
-
Due date
-
CBR Information
-
Additional information of relevance from the client or previous contractors
-
This has been shared with the relevant people
-
An engineer has been allocated to this site
-
Who is the engineer at this site?
-
Date given for survey start dates?
-
When?
Other works required
-
Any other works required?
-
What works are required?
-
Has this been arranged?
-
Date of other works
-
The initial required materials have been decided and finalised
-
This information has been given to the CRS buyer
-
Partial information has been given to the CRS Buyer
-
Which material details are not yet finalised?
-
Do you have all information regarding Water run-off, TPO, other environmental, overhead services?
-
Date agreed for this information
-
Provide any information
-
Has this been shared with the relevant people?
-
One Drive site file has been created and shared
-
Site manager requires a telephone/sim card
- Telephone
- Sim card
-
Telephone ordered
-
Sim card ordered
Applications required
-
Please select the application required?
-
Application type required
-
Has this application been submitted
-
Has this application been approved
Relevant reference numbers obtained from client:
-
NHBC Inspector Number:
-
Highways Inspector Number:
-
Section 104 number:
-
Action required?
Mark Gladwin - Estimating, Initial client agreements and information
-
Start finish times have been confirmed
-
Start
-
Finish
-
Are there any other site restrictions?
-
Please provide details
-
Are CRS required to provide a jet washer / gateman?
-
Have you told the plant manager and contracts manager?
-
Drawings requested from client
-
Drawings received from client
-
Date due
-
Tender drawings/any superseding drawings have been passed to Technical Manager
Superseding drawings
-
Received on
-
Passed to Technical manager
-
Action required?
QS - Michael Roberts, Greg Kendall, Alfie Wright
-
Are we required to provide security
-
Has security been arranged?
-
Who is the security company
-
Contact details
-
Install date
-
Who will provide access
-
Liaise with Plant Manager and H&S Manager for details of barriers being ordered
-
Heras panels (inc feet and clips)
-
Cost confirmed with plant manager
-
Charged to
-
Heras panels (panel only)
-
Cost confirmed with plant manager
-
Charged to
-
Ped Barriers
-
Cost confirmed with plant manager
-
Charged to
-
Bunting (metres, inc pins)
-
Cost confirmed with plant manager
-
Charged to
-
Are any additional footpaths required, or any areas for stoning up?
-
This will be paid for by
-
This has been confirmed with them
-
Additional information
-
Any Construction Issue Drawings, Specification, Programme, Bill of Quantities (Supplied by Quantity Surveyor)
-
Has this been shared with the relevant people?
-
Action required?
Darren Houghton - Contracts Manager
-
Who is the initial supervisor at this site?
-
Start date
-
Aware
-
Is this the permanent supervisor
-
Who is the permanent supervisor at this site?
-
Start date
-
Aware
-
Operatives have been allocated to site for the start date and have been made aware
-
I have checked with H&S that they have the required competencies, cards and/or qualifications for their role
-
Will we be carrying out works in road?
-
I have checked with H&S that streetworkers have the required competencies, cards and/or qualifications for their role
-
I have told the CRS Buyer, so he can order relevant Chapter 8 barriers and source signage
-
I have confirmed with the Technical Manager that the required permits will be in place
-
Suitable area identified on site for spoil
-
Where?
-
Suitable area identified on site for materials
-
Where?
-
Temporary services arranged
-
Water
-
Electricity
-
Confirm if all required services are connected
-
The estimating manager has confirmed to me that we are required to supply a gateman / jet washer
-
Start date confirmed with an operative to carry out this role
-
Action required?
Project Manager Setup Completion
-
I can confirm that I have reviewed the information and that site operation is ready to commence