Title Page
-
Site name:
-
Lot numbers
-
Conducted on
-
Prepared by
-
Location
Site Setup and Amenities.
-
Temporary fencing installed around site?
-
Construction site sign legible and displayed<br>on front fence?
-
Health and Safety Co-ordination plan,<br>permit and plans in the meter box?
-
Toilet on site clean and in good working<br>order?
-
Site office installed and setup?
-
Cool drinking water available?
-
Site induction training completed for all new trades on<br>site?
-
Construction Induction training completed?<br>(Red card or equivalent)
-
SWMS's completed for medium/high risk trades on site?
undefined
House Keeping
-
Safe access to and around work areas?
-
Are the temporary fences maintained and secure for the general public.
-
Is rubbish regularly removed from site?
Electrical Safety
-
Temporary supply boards (RCD'S lockable,<br>leads through insulated slot, signs, 1metre<br>clearance at front, tie bar
-
Certificate of electrical safety for boards?
-
Earth leakage protection required?
-
Earth leakage protection provided?
-
RCD in meter box tested monthly - Take<br>photo of last test in meter box?
-
Electrical equipment and leads:<br>1/ Checked and tagged every 3 months?<br>2/ Secured and off the ground?<br>3/ Length not exceeding 35 meters?
Overhead power lines on poles
-
Scaffolding not erected within 4.6m of sides<br>or 5m above or below power lines on poles<br>without written permit, from power<br>authority, SWMS and meeting.
-
Spotter required if mobile plant between 3m<br>- 6.4m of power lines on poles.<br>Written permit, from power authority SWMS<br>and meeting if closer than 3m.
Fall protection required when working at heights over 2 metres
-
Scaffold provided for all fall protection?
-
Guardrails provided for fall protection?
-
EWP's provided for fall protection?
-
Floor and wall penetrations barricaded or<br>covered?
Construction foreman sign off
-
Add signature
-
Select date