Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Site Accommodation & Welfare Facilities

  • Site project office - for how many?

  • Trades office - for how many?

  • Canteen - for how many?

  • Toilets - male and female, existing or new

  • Drying room - lockers, hooks, benches

  • Security office

  • Kitchen

  • Induction room - chairs and tables from stock

  • First Aid room

  • Tea point

  • Meeting rooms

  • Cabin setup requirements

Build Spec

  • Ceiling height and requirements per room

  • Walls - drywall, single skin, taped joints, painted white?

  • Doors - Fire (1/2hr FR) and security (3 / 5 lever)

  • Power - accommodation requirements, location of distribution board

  • Ventilation requirements for office, toilets & drying room

  • Water & waste - supply from? waste to location?

  • Lighting requirements

  • Heating requirements

  • Painting and decorating

  • Hoarding requirements

  • Furniture requirements (from our store? - for no. of deliveries) desks, chairs, pedestals

Logistics - Access & Egress

  • Pedestrian access & egress route

  • Vehicle access route

  • Vehicle height, width, weight and turning restrictions

  • Loading bay size, storage space, beneficial use

Logistics - Vertical transport

  • Vertical transport - Goods lift/Hoist

  • Vertical transport sizes, openings, weight restrictions

  • Route and waiting areas for vertical transport

Logistics - Communication

  • Site Radios

Logistics - Plant, Material & Supplies

  • Barriers, barrier tape, spare protection (starter pack)

  • Wet vac

Logistics - Signage

  • Signs around the site and local restrictions

  • Sign boards and IQ boards

Logistics - Details about the project

  • Impact of project on tenants and local business

  • Parking nearby and restrictions

  • Our impact on peak hour traffic (vehicle and pedestrian), i.e: pinch points

  • DMS requirements and Carbon Emissions reporting

  • Building Manager - who? where?

  • Levels the project includes?

  • Project duration and mobilisation / enabling works

  • Possible start date

Logistics - Materials Handling / Storage

  • Forklift requirements

Logistics - Site Setup

  • Welfare supplies

  • Herras fencing

  • Barriers

Logistics - Drawing requirements

  • Fire plan

  • Logistics plan

  • Material storage zones

  • Protection plan

Logistics - Public Highway

  • Parking bay suspension

  • Hoarding licence

Logistics Team

  • Logistics Manager

  • Ganger

  • Loading Bay Manager

  • Vehicle Banksman

  • Security Guard - Day

  • Security Guard - Night

  • Welfare Person

  • Fire Warden

  • Labourers

  • Carpenter / Handyman

  • Slinger / Signaller

  • Hours of work - shift patterns

Protection Works

  • Perimeter glazing - layout and distance between mullions

  • Atrium glazing - layout and distance between mullions

  • Soundproof walkway

  • Access route protection for goods and pedestrians

  • Columns

  • Goods lift protection

  • Goods lift lobby protection

  • Pedestrian / Fireman's lift protection

  • Pedestrian lift lobby protection

  • Riser doors

  • Lobby doors

  • Staircase protection - treads, risers, handrail, balustrades

  • Staircases locked off with break glass partition

  • Client advertising restrictions

  • Main lift lobby protection or lock off

  • Existing toilet protection

  • Storage of existing doors and location

  • Photos (condition survey)

Waste Management

  • Bins - 360L / 660L

  • Skips

  • Space in Loading Bay

  • Segregation requirements and restrictions

  • BREEAM / LEED / SCAR requirements

  • Spill kits (training)

  • Hazardous waste stations and locations

Pest Control requirements

  • Survey required?

Access Control System

  • Access Control System? Location? No of possible operatives on site?

  • Basic System (computer, software, hardware)

  • Tripod turnstile/s

  • Full Height turnstile/s

  • Biometric (hand)

  • Consumables (card, ribbon, ink cartridges)

Security

  • Guards required

  • Shift patterns

  • Evacuation procedure

  • Emergency information board (muster point, contact information, fire/bomb evacuation, first aid, neighbour contact info, emergency services contact info, ground floor escape route plan)

Fire Strategy & Fire Extinguisher supply

  • Fire plan requirements

  • Fire extinguishers per floor

  • Muster point and lollipop system

  • Fire alarm break glass covers - with or without alarm

  • Evacuation plan

  • Other Notes

  • Person conducting site survey

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.