Title Page
-
Site conducted
-
Location
Checklist
-
Has “What to expect next” Tenant letter been sent / delivered
-
Has “What to expect next” Tenant letter been signed by all parties / copy received
-
IF the answer to any of the above is NO do not continue until letter signed
-
If required is there a party wall agreement in place If Not refer to SDC Do Not Commence works
-
Are there any Western power issues ie Un-sheaved overhead cables
-
If the answer to the above is yes inform Kevin / Simon do not erect scaffold
-
Do you have a copy of the asbestos report for the property Download from CIVICA
-
Are there any Western Power Cables clipped to the building if yes inform Kevin / Simon (Avonlea to unclip & re clip)
-
Are there any external cables to unclip
-
Are there any wall mounted security/outside lights to remove
-
Are there any external Sockets to remove
-
Are there any satellite dishes / aerials that need moving
-
Are there any extract fans that will need alterations
-
Are there any obstacles in the way of the expected scaffolding (if yes note & photo)
-
Are there any fixtures to the walls that need removing (if yes note & Photo)
-
Are there any external Kitchen / Bathroom waste pipe / soil stacks overflows / Condensate pipes that need altering
-
Are there any water feeds / outside taps that need altering / removing
-
Are there any Gas pipes / flues that need altering (Must be gas safe engineer and LGSC certificate)
-
Are there any Air / Ground source heat pumps that need moving with temp connections refer to SDC
-
Are there any Radon gas extraction units that need altering removing
-
If the answer to the above is yes, please check if they work and record with a photo if possible
-
Are there any structures / outbuildings that will impede the scaffold (if yes note & photo)
-
Have you completed a photographic delap of the external paths, drive, windows, doors, flower beds, outbuildings etc
-
Save this form, copy of signed tenant letter and any photos in the pre-start check list folder in the 180 job file on the N drive
Signed
-
Completed By
-
Date