Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Inspection Checksheet
Kitchen
-
Kitchen fitted as per design
-
Units level
-
Unit door alignment
-
Worktops fitted
-
Plinths
-
Flooring
-
Sink taps
-
Kitchen Doors working
-
Pipe clips
-
Tile beading
-
Wall tiling
Electrics
-
Rewire completed to spec
-
Consumer unit labelled
-
Sockets level
-
Earth bonding
-
Cooker
-
Lights
-
Smoke and heat detector
-
Fan extract (Vectaire)
-
Smoke and heat
-
Elec cert
Plumbing
-
Hot and cold water pipes replaced
-
Washing machine plumbed in
-
Waste pipe
-
Gas chain
-
Gas cert
Sign off
MD Group Sign Off
-
I confirm I have inspected the property and all the works are correct as per the specification and ready for handover.
Customer sign off
-
I can confirm I am happy with the works.