Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Inspection Checklist
-
Flooring
-
Wall tiling/boarding
-
Taps
-
Leaks
-
Bath/Basin overflow
-
Earth bonding visible
-
Decorations
-
Silicone seals
-
Bath Fixed Correctly
-
Bath panel fitted
-
Basin fixed correctly
-
WC fixed correctly
-
Shower and Screen
-
Scale inhibitor fitted
-
Electrics
-
Skirting
-
Extractor fan (Vectaire)
-
Cleanliness
Sign off
MD Group sign off
-
I can confirm I have inspected the property and all works are correct as per the specification and ready for handover
Customer Sign Off
-
I can confirm I am happy with the works completed.