SST082
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Information Required
-
Mobile Plant Acceptance On Site Pre-Start Checklist
-
Site Name:
-
Site No:
-
Equipment Type:
-
Serial No:
-
Equipment Model:
-
Supplier:
-
Location of Use:
-
To be used for Mobile Plant e.g. Dumpers, Excavators, Rollers, Forklift, Telehandlers.
-
(there are separate checklist templates for Cranes, Concrete Pumps and MEWPs)
-
Documentation
-
Have Original certification (CPCS/IPAF) for Operator(s) been seen?
-
Is the operator's manual provided with the item of plant specific to the make and model?
-
Has the 6 monthly thorough examination certificate been provided and in date?
-
Is the service / maintenance history available?
-
Has the plant and equipment been inspected prior to arrival?
-
Condition of Plant
-
Is the general cleanliness inside and outside acceptable?
-
Is the plant free from obvious visual damage or missing parts?
-
Are items such as linkages, props, struts, cables and hoses in good order?
-
Are brakes and steering fully functional?
-
Are the wheel/nuts, tyres and tracks intact, securely in place and in good condition?
-
Are fuel, engine/hydraulic oils and coolant levels adequate, with no leakage?
-
Is the item provided with secured special gas cylinders if LPG powered?
-
Are all moving parts protected by fully operational and suitable guards?
-
Is the plant fitted with headlights, indicators, number plates and a horn?
-
Is the exhaust system in good condition?
-
Is the plant generating excessive noise, fumes or other exhaust gases?
-
Safety Requirements
-
Does the plant clearly display all appropriate safe working load (SWL), pressures or speeds?
-
Are all controls including emergency stops, clearly identified and marked?
-
Is the flasher amber beacon visible from 360 degrees and in working order?
-
Does the operator have 360 visibility at a height and distance of 1m around?
-
All edge protection and handrails suitable and secure?