Information
-
Site Address
-
Company Name
-
Date Prepared
-
Prepared by
Pre-start Site Checklist
Induction and Training
-
Trade Induction Pack completed and on site?
-
What is the reason for not having the induction pack on site?
-
All workers on site have completed the ABN Group Induction and signed the Pack?
-
Ensure all workers have read and signed the Trade Induction Pack before commencing work.
Hazard Assessment
-
Do you have a generic Safe Work Procedure (SWP) for the works that you do?
-
Please complete the SWP template located on page 26 of the Trade Induction Pack
-
For works on the upper floor of a double storey home
-
Is the void platform in place and all window and door openings barricaded?
-
Contact the Site Manager to rectify or install barricades before commencing work.
-
Have any hazards been identified on this site which may affect your ability to work to your SWP?
-
Please complete a site specific SWMS in the next section before commencing works.
-
Will you be completing any works that are deemed High Risk?<br>High Risk works include;<br>Working at a height above 2 metres<br>Working with Mobile Plant or Equipment (concrete pumps, excavators, etc.)<br>Working in excavations deeper than 1.5 metres
-
Please complete a site specific SWMS in the next section for High Risk works before commencing.
Compliance
-
All electrical equipment and leads are tested, tagged and up to date?<br>RCD boxes are tested monthly?
-
DO NOT USE ANY UNTAGGED OR OUT OF DATE EQUIPMENT ON SITE!
-
Does the work involve the use of Mobile Plant?
-
Plant or Equipment is regularly serviced and maintained and a pre-start operational check has been completed?
-
Will you be using any Hazardous Substances?
-
Are Safety Data Sheets available for review or in case of an emergency?
-
Ensure that you have access to Safety Data Sheets for Hazardous Substances, these are available from the supplier.
SWMS for High Risk Work
Safe Work Method Statement
-
Use this SWMS if you are completing High Risk works or if hazards outside the scope of your Safe Work Procedure have been identified.
-
Works to be completed
-
Type of Safe Work Method Statement
-
List all High Risk tasks, the hazards associated with the tasks and how the hazards will be controlled.
High Risk Tasks
-
Task
-
Associated Hazards
-
Implemented Controls
-
List all the hazards that are not covered by your Safe Work Procedure and how you are going to control them
Identified Hazards
-
Identified Hazard
-
What will you put in place to control the hazard?
Worker Sign Off
DECLARATION BY SITE WORKERS INVOLVED IN THE WORK ACTIVITY
-
1. I have reviewed and been given the opportunity to comment on the content of the company's SWP.
2. I have read and understand how I am to carry out the tasks listed in the SWP.
3. I have read and understand the requirements set out in the ABN Group's trade Induction Pack. -
-
Name, Date and Signature