Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Select date

Overview of the IT environment

  • In this section you should describe the operating environment

Manage changes

  • Conduct a walk though of the change management process.

    Describe the controls that operate. pay particular attention to the following controls:
    MC1: changes implemented have been requested and approved through a process to ensure that only the right changes are implemented.
    MC2: changes are tested
    MC3: changes are approved by management before they are implemented into the production environment. For emergency I changes these should include approval as soon as possible after the implementation of the change.
    MC4: a segregation of duties exists between those developing changes and those implementing the changes into production.
    MC5: management reviews, periodically, the changes moved into production to confirm that only approved changes are in production.

    Other controls may exist. Where these controls complement controls MC1 - MC5 then they should be documented.

  • Draw a flow chart of the process

  • Does MC1 exist?

Test manage changes

  • Approximately how many changes are implemented per year?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.