Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
Overview of the IT environment
-
In this section you should describe the operating environment
Manage changes
-
Conduct a walk though of the change management process.
Describe the controls that operate. pay particular attention to the following controls:
MC1: changes implemented have been requested and approved through a process to ensure that only the right changes are implemented.
MC2: changes are tested
MC3: changes are approved by management before they are implemented into the production environment. For emergency I changes these should include approval as soon as possible after the implementation of the change.
MC4: a segregation of duties exists between those developing changes and those implementing the changes into production.
MC5: management reviews, periodically, the changes moved into production to confirm that only approved changes are in production.
Other controls may exist. Where these controls complement controls MC1 - MC5 then they should be documented. -
Draw a flow chart of the process
-
Does MC1 exist?