Title Page
-
Site conducted
-
Location
-
Prepared by
-
Contractor (Eden or subcontractor)
-
Conducted on
Overview of Works
-
Was the kiosk area free from stock, paperwork and rubbish prior to work beginning?
-
Show Guidance
-
Check with contractors whether the kiosk area was left in a condition for work to begin or did they need to move and tidy the are before they can begin work
-
Did lighting remain on at an acceptable level for the duration of the work ?
-
Show Guidance
-
Check with contractors that lights remained on for duration of work
-
Is the area free from rubbish and materials post installation ?
-
Show guidance
-
After completion of the secure kiosk, no cardboard ,packaging or other rubbish should be left on the shop floor. Materials such as unused screws, bolts and nuts. Any removed covid screens etc should not be on the shop floor.
-
Have the kiosk screens been cleaned and free from marks or fingerprints?
-
Show Guidance
-
No marks or finger prints should be on the kiosk screens. The screens should be ready for immediate use without the necessity for cleaning.
-
Is the door clean free from marks, fingerprints or damage ?
-
Show Guidance
-
No marks or finger prints should be on the doors. The doors and handles should be ready for immediate use without the necessity for cleaning.
-
Are door hinges secure with all screws in place?
-
Show Guidance
-
Check both door and frame to ensure hinges are well fitted with all screws etc in place.
-
Is the digi lock correctly installed and works?
-
Show guidance
-
Check digi locks works from both inside and outside the kiosk
-
Has the code been changed from the default e.g.. C1234XY and communicated to store colleagues. Please add code to notes
-
Show Guidance
-
Check digi code is random and not 1234 etc and this information has been given to the store
-
Is the Digi lock protected in a way that can not be reached from the outside ?
-
Show Guidance
-
It should not be possible to reach round and unlock the door from the outside. Check this can not be done.
-
Does the door close automatically without the need for manual closing?
-
Show Guidance
-
The door should lock and close when it is let go without the need to physically lock it shut
-
When the door closes does it do so in a way to avoid unnecessary noise or vibrations?
-
Show Guidance
-
Does the kiosk or screens make unnecessary vibration or noise when the door is closed, check the door to see if this occurs.
-
Do all hatch areas with windows close effectively and can remain locked when not in use?
-
Show Guidance
-
Check hatch area windows lock effectively and can not be easily opened form the outside
-
Are all floor bolts tight and not presenting a trip hazard ?
-
Show guidance
-
Check any floor bolts or floor fittings are well fitted, do not present either a trip hazard or health and safety risk
-
Does the over all structure appear secure with no undue flexibility?
-
Show Guidance
-
Check sturdiness of all areas and screens, ensuring they are correctly fitted
-
Have all bolts and screws been attached ?
-
Show guidance
-
All designed screw holes and attachments should be used. Holes with metal directly behind are unlikely to be used for assembly
-
Have all wall attachments and bracing bars been correctly attached with no evidence of loose or missing fastenings ? Please attach photos
-
Show Guidance
-
Where possible and adhering to good health and safety practices, check wall fitting have been attached correctly with no missing fastenings.
-
Is the secure kiosk free from any other faults or defects not highlighted in previous questions?
-
Show Guidance
-
Please mention any faults or concerns you have highlighted that are not listed in the above questions. Add photos where ever possible
-
Was the installation complete prior to planned store opening?
-
Show Guidance
-
Was all work completed prior to opening including cleaning and rubbish removal .
-
If remedial work is required please outline plan to remedy
-
Is there any other information that need capturing?
Sign Off
Kiosk Signoff
-
Construction Signoff
-
Contractor Signoff
Practical Completion Handover
-
Does the Person In charge (eg Store Manager/ team leader) confirm that handover of this site is accepted on the basis that it meets the requirements of this checklist as confirmed by the construction presentative .
-
Person in charge Signoff