Information
-
Project Name
-
Document No.
-
check document number with WHS advisor
-
Location
-
Conducted on
-
Prepared By
-
Project/Development Manager
Site Security and Public Protection
-
IA-1. Is warning signage in place, adequate, unobstructed and visible from the access point?
-
IA-2. Evidence of unauthorised persons accessing the site either on foot or in vehicles?
-
IA-3. Access for Emergency Vehicles maintained?
-
IA-4. Site perimeter fencing and/or barricading gates is in place and maintained; which is appropriate for the area and site risks?
-
IA-5. Are the public adequately protected from existing hazards within the development boundaries (e.g. excavations, risk of falls, water bodies, dilapidated buildings)
-
IA-6. Is there evidence of illegal dumping?
-
IA-7. Is there any potential conflict with construction traffic?
Utilities
-
IA-8. Are the overhead power lines/ phone lines impacting access to the site?
Environmental
-
IA-9. Is there a HAZMAT Report or Asbestos Management Control Plan (AMCP) in place for the project?
-
IA-10. Is the HAZMAT Report or Asbestos Management Control Plan (AMCP) controls implemented?
-
IA-11. Is there a Bush Fire Management Plan in place for the project?
-
IA-12. Is the Bush Fire Management Plan implemented?
Other
-
Other hazards identified?