SST024

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Information Required

  • Permit to Alter Design, Load, Unload, Strike Temporary Works

  • Contract Name:

  • Project Number:

  • Contractor Supervisor in Charge of the Works (print name)

  • Permit No

  • Date Issued

  • Start Time

  • Finish Time

  • RAMS Ref

  • Rev Date

  • Description and location of Works

  • Permit required for (circle applicable)

  • 1. Alter Design

  • 2. Load / Unload

  • 3. Strike

  • Applicable Drawings

  • Applicable Method Statements

  • If yes, identify the back propping requirements inc. drawing reference and sequence

  • Back Propping Required? (circle applicable)

  • Date until back propping is to remain in place until?

  • Confirmation by Contractor's Supervisor:

  • Name

  • Position

  • Signature

  • Date

  • Confirmation by Temporary Works Co-ordinator:

  • - Name of Temporary Works Co-ordinator

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.