Permit to Alter Design, Load, Unload, Strike Temporary Works
-
Contract Name:
-
Project Number:
-
Contractor Supervisor in Charge of the Works (print name)
-
Permit No
-
Date Issued
-
Start Time
-
Finish Time
-
RAMS Ref
-
Rev Date
-
Description and location of Works
-
Permit required for (circle applicable)
-
1. Alter Design
-
2. Load / Unload
-
3. Strike
-
Applicable Drawings
-
Applicable Method Statements
-
If yes, identify the back propping requirements inc. drawing reference and sequence
-
Back Propping Required? (circle applicable)
-
Date until back propping is to remain in place until?
-
Confirmation by Contractor's Supervisor:
-
Name
-
Position
-
Signature
-
Date
-
Confirmation by Temporary Works Co-ordinator:
-
- Name of Temporary Works Co-ordinator