Title Page
-
Site conducted
-
Customer Name
-
Job Name
-
Location
-
Add plan if relevant
-
Permit To Dig No.
-
Site and extent / length of excavation this permit covers
-
Permit to Dig valid from (date)
-
Permit to Dig valid to (date)
-
Project Manager of Contract
-
Brief description of work
Permit Closure on Completion
-
I confirm the works are complete and that the work area has been left protected or reinstated and tidy
-
Signed:
-
Name:
-
Position:
- Project Manager
- Contracts Manager
- Site Manager
- Section Manager
- Supervisor
- Foreman
- Plant Operator
- Groundworker/Banksman
- Site Operative
-
Date:
Permit Checklist
-
Are all the relevant task plans / drawings and specifications available and have these been fully communicated to operatives
-
Are the RAMS specific to this task, communicated to and signed on by all operatives
-
Are Service Searches completed, the underground service plans for the site available and these reviewed and checked
-
State any known Services within Dig Area
- Land Drainage
- Foul Drainage
- Sewer
- Storm Drainage
- Overhead Electricity
- Overhead Telecoms
- Underground Cable
- Telecoms
- Gas Main
- Water Main
- Fibre Optic
- Ducting
- Ground Source Heating
- Irrigation
- CCTV
-
Has the site been visually inspected for any above ground indicators of services?
-
If working / excavating within 6m of an overhead utility, is GS6 Protection in place?
-
Based on the evaluation of this job / site are there any utilities or services that require physical location by hand or air excavation prior to main excavations to confirm depth and position?
- Yes
- No
- N/A
-
Details
-
Has service location been completed on this job?
- Yes
- No
- N/A
-
Is GPR service location required for this job?
-
Do you have an approved Traffic Management Plan for this site and has the traffic management been set up in accordance with it?
-
State what provision has been made for the environmental impacted (e.g. spoil disposal, sediment control, archaeology etc.) and stakeholder impacts (e.g. disruption)
-
State any special requirements in relation to unique services (e.g. easements or restrictions to power lines, major gas or water mains or fibre optic cables, power cables etc.
-
Have all underground services been marked on the site by the utility company(s)?
-
Has the location and outline of the proposed trench been set and marked out?
-
Has a scan of the area within the area of the proposed excavation been completed? This check should be completed with a cable detector (with genny) and GPR (if required) by either trained members of the Team or by an approved external party.
-
Is a CAT & Genny present during all works and a trained person to use
-
Details of model ID, Calibration dates and person to use
-
CAT Scanning should be undertaken regularly through the dig to confirm the location or presence of any Service
Excavation Checklist
-
Has all service location or checking by the chosen method been completed?
-
Have all known (and indicated) services been identified and located?<br>If not, then stop work until they have been found. If yes, then proceed with excavation.
-
Do all operatives fully understand the brief for the works in this section and the specific requirements due to service location
-
This Permit To Dig is valid from:
-
Until:
-
This Permit to Dig can only be provided by a Senior Manager, Supervisor or Engineer only
Each person receiving the Permit To Dig
-
I fully understand the limits of this Permit To Dig and will comply with any requirements of this or the RAMS accordingly.
-
Position on Team
- Project Manager
- Contracts Manager
- Site Manager
- Section Manager
- Supervisor
- Foreman
- Plant Operator
- Groundworker/Banksman
- Site Operative