PFS COMPLIANCE AUDIT
-
Site Name/Number
-
Visit Date
-
PFS Operations Coordinator
-
Store Manager:
-
Area Manager
1. E-Site Register/Staff training.
-
1# 1.1. E-Site Register staff training - check training cards are complete and E-Site Register training documented.
-
1.2. Test E-Site Register Log On.
-
1.3. E-Site Register training documents available - issued with brief sent by retail operations dated 6th November 2013.
-
2# 1.4. PFS Forecourt Daily Checklist completed as per company procedure. (reference notes available).
-
3# 1.5. PFS Weekly/Monthly Checklist completed as per company procedure (reference notes available).
-
4# 1.6. LPG Daily Checklist completed as per company procedure (reference notes available).
-
1.7. Record of Visitors to Petrol Filling Station Implemented as per company procedure.
-
5# 1.8. Evidence of Petrol Competency "annual refresher" training for all staff.
-
1.9. Petrol Competent Person Register completed and up to date as per company procedure (refer to competent person training references).
2. Health and Safety.
-
2.1. Petrol COSHH Risk Assessments and data sheets available (Issued by health and safety department).
-
2.2. Holchem COSHH Risk Assessment and Data sheets available (issued by health and safety department).
-
2.3. PPE Equipment available (order via oracle) refer to PPE Checklist. 3 x traffic cones, 2 x high visibility vests, 1 x safety goggles, face masks dust respirator, rubber gloves, 2 x paper overall suits, 2 piece wet stock, 2 x Wellington boots, Apron.
-
2.4. Approved V-Kleen cleaning chemical and pump available.
-
2.5. Sand buckets in good condition 3/4 full of kiln dried sand, spreading tool available, 25 kg of spare sand available.
-
2.6. Contaminated sand bunker in good condition and securely locked.
-
2.7. Diesel gloves and towels available for customers.
-
6# 2.8. LPG Autogas First Aid instructions displayed- order via expenses (purchasing).
3. Forecourt Equipment and Signage.
-
3.1. LPG Autogas Compound lighting operational.
-
3.2. LPG Autogas Compound tanks/pipework in good condition.
-
3.3 LPG Autogas Compound secure with padlocks, 2 x 9kg fire extinguishers available.
-
3.4. DCD/DEC and Emergency box - test telephone/test alarm/light operational/check fire extinguisher 6kg powder/check sand bucket and sand available 3/4 full, WD40, pump 2 tank mapping.
-
3.5. LED Pole Sign working, grade identification. Power off switch clearly marked inside kiosk if available.
-
3.6. Cylinder Calor Gas - cage in good condition, cage and POS in situ, securely locked, cage location as per approved layout drawing and Calor housekeeping procedures implemented.
-
3.7. Test Tannoy/PA system operational.
-
3.8. Forecourt Fireman's (switch/switches) signage in good condition.
-
3.9. Canopy Height Restrictions - MML.
-
3.10. Stanchion Hazard Warning notices and card acceptance,pump numbers - MML.
-
3.11. Spill advise to customer displayed - expenses pad.
-
7# 3.12. Sentry A frame signage - order via rcposreq (marketing) - Sorry we are now closed, Sorry services are unavailable, Sorry all pumps in this lane are closed, Caution slippery surface, No Smoking or Naked Lights.
-
3.13. Pole sign posters - order via rcposreq (marketing).
-
8# 3.14. All Forecourt Equipment Reliability Feedback - Pumps, Car Wash, Jet Wash, Vac, Air, Pole Sign LED, Tank Gauge.
-
9# 3.15. Overall Forecourt Contractor Feedback - Excellent, Good, Average, Poor, Unacceptable.
4. Offset Fill Point / Tank Manhole Chambers and Interceptor Channels.
-
4.1. Offset fill grade label/ tank safe working capacity details as per current pump 2 tank mapping.
-
4.2. Tank fill caps tight and correctly padlocked.
-
4.3. Offset fill point signage in good condition, caution high level alarm, no overfill prevention warning sign (if applicable). Vapour Recovery hose connection signage, Maximum hoses signage, Vent stacks signage in good condition numbered correctly and vent stack hazard sign displayed.
-
4.4. VR cap tight securely padlocked.
-
4.5. Blanked Tanks (if applicable) secure and blanked of correctly.
-
10# 4.6. Vent stacks in good condition and free from corrosion.
-
11# 4.7. Tank Manhole Chambers free from water, warning signs in situ - VR warning sign (if applicable), pipework signage fitted (if applicable), tank grade number safe working capacity and number, all ducting sealed correctly.
-
12# 4.8. All Interceptor channels clear of debris and in good condition.
5. Pump Security.
-
13# 5.1. Pump Locking Bars available for all pumps, include LPG pumps if applicable.
-
14# 5.2. Individual nozzle locking bars and Out of Order signs available.
6. Pump Emergency Manual Changeover/LED Polesign Failure.
-
15# 6.1. Emergency Box set-up - As per company procedure.
-
16# 6.2. Emergency Procedure available (for all types of pumps).
-
17# 6.3. In the event of LED Pole Sign Failure not being able to display prices correctly back up display equipment available - 1 x A frame and Today's Petrol Price Poster.
7. General Housekeeping/Standards of the Forecourt/Cleaning Procedure.
-
18# 7.1. Cleaning Record Document completed as per company procedure.
-
7.2. All Pumps in good condition, Alvern holder, perplex cover, inserts and splash guard fitted and in good condition,decals, M logos, Magencap holders and Point of sale, Pump Numbers and Operating Instructions and OPT headers.
-
19# 7.3. Car wash fully operational, wash bay clean and clear of debris, bay lights working, minimum chemical level clearly marked on chemical containers, quick reference guides available.
-
20# 7.4. Vacuum in good condition- spare crevice tool available, Daily care procedure implemented.
-
7.5. Airline in good condition and working order.
-
21# 7.6. Jet wash in good condition -bay clean and tidy, spare lance,brush, hose, wd40 and adjustable spanners available. Daily care procedure available.
-
7.7. Watering can and screen buckets (with sponge) available.
-
7.8. Plant room - clean and tidy, easily accessible and plant room heater fitted and test for operation.
-
22# 7.9. Reclaim Salt container correctly topped up with salt, spare salt available (if applicable).
8. Administration standards.
-
23# 8.1. All notice board documents are correct and in date - emergency procedures, operating procedures, pump 2 tank map, hazard zone plan, group company health and safety policy statement, certificate of employees liability Insurance, Morrison's miles loss prevention notice, first aid list, competent person list, current contacts list, emergency manual procedures and bulletin.
-
24# 8.2. Filing cabinet set up correctly as per my sis headers. (13 months delivery certificates).
-
25# 8.3. Fairbanks tank gauge wet stock sign in situ.
9. Leaflets and Posters.
-
26# 9.1. Car wash price poster displayed - order via rcposreq (marketing).
-
9.2. "LPG Autogas available at this pump" applicable sites only - order via posreq (marketing).
-
9.3. Pay@pump leaflet available - order via rcposreq (marketing).
-
9.4. Fuelgenie leaflet available - order via rcposreq (marketing).
-
9.5. Calor Cylinder Gas legal safety agreement leaflet available - order via rcposreq (marketing).::
-
9.6. Licensee address plate - MML.
-
27# 9.7. AA Misfuel leaflet available - order via rcposreq (marketing).
10. E-site Register Sign Off (PFS Operational Coordinator).
-
10.1. Check all information on the Home page is relevant and accurate.
-
28# 10.2. Check all the Documents under the Documents tab are current and relevant.
-
29# 10.3. Check all the Information on the Information tab - site asset details.
-
30# 10.4. Check pump serial numbers enter any amends below.
Additional Comments/Feedback
-
All action points where improvements have been identified on this report should be resolved and confirmation sent via e-mail to your PFS Operations coordinator, please copy your area manager and regional director by:-
Sign Off
-
PFS Operations Coordinator:
-
PFS Manager/Delegate:
-
Report discussed with - Duty Manager: