Information

  • PFS NEW STORE OPENING CHECKLIST

  • Site Name/Number

  • Store Manager:

  • Area Manager

  • PFS Operations Coordinator

1.Car wash.

  • 1.1. Machine to current specification including under chassis wash.

  • 1.2. Chemicals full and minimum level marked on containers.

  • 1.3. Sound horn signage displayed in wash bay.

  • 1.4. Silt trap clear.

  • 1.5. Bay lights working.

  • 1.6. Programmes working, all 3.

  • 1.7. Heater in plant room and operational.

  • 1.8. Plant room access clear.

  • 1.9. Cat 5 cable fitted and terminated for future use.

  • 1.10. EPOS Prices correct.

  • 1.11. Car Wash Price poster displayed.

  • 1.12. Daily checklist displayed on staff notice board and on the e-site register.

  • 1.13. All ducts sealed in both wash bay and plant room.

  • 1.14. Water softener installed and salt available.

2. Jet wash.

  • 2.1. Working on all programmes.(7.5 minutes £3, 10 minutes £4, 12.5 minutes £5, 15 minutes £6).

  • 2.2. Chemicals full.

  • 2.3. Spare hose, lance and brush available.

  • 2.4. Padlocks available.

  • 2.5. Fitting tools left by contractor. (Adjustable spanners x2).

  • 2.6. Daily check sheet displayed.

  • 2.7. Prices correct on EPOS (7.5 minutes £3, 10 minutes £4, 12.5 minutes £5, 15 minutes £6).

  • 2.8. Not linked to trend system.

  • 2.9. Cat5 cable fitted and terminated for future use.

  • 2.10. Correct decal fitted.

3. Vacuum.

  • 3.1. Working and timer set correctly (£1.00 for 4 minutes).

  • 3.2. Price correct on EPOS (£1 for 4 minutes).

  • 3.3. Fragrance chemical full.

  • 3.4. Spare crevice tool and hose available.

  • 3.5. Cat5 cable fitted and terminated for future use.

  • 3.6. Daily check sheet displayed.

  • 3.7. Correct decal fitted.

4. Airline.

  • 4.1. Working and timer set correctly

  • 4.2. Free air button available on EPOS.

  • 4.3. Caution legal sign fitted.

  • 4.4. Cat5 cable fitted and terminated for future use.

  • 4.6. Correct decal fitted.

5. Offset fill.

  • 5.1. Vent stacks numbered correctly (to tank number).

  • 5.2. Correct grade labels fitted.

  • 5.3. Hazard warning signage fitted.

  • 5.4. High level alarm signage fitted.

  • 5.5. VR connection signage fitted.

  • 5.6. 2 hose connection sign fitted.

  • 5.7. Padlocks and keys available (universal DHL set).

  • 5.8. Vapour balance warning signage fitted.

  • 5.9. Slope on offset fill point towards interceptor.

  • 5.10. Yellow hatching as per DSEAR - complete tanker bay - not applicable on dedicated tanker lane.

  • 5.11. High level and low level lighting working and to specification, low level lighting ducting and cable on the external offset wall sealed.

6. Manholes.

  • 6.1 Manhole lifter available.

  • 6.2. Correct grade label fitted.

  • 6.3. VR2 warning label in all unleaded chambers.

  • 6.4. Pipe work labelled to pumps.

  • 6.5. Check the valves are open/closed.

  • 6.6. Security grates fitted within manhole chambers.

  • 6.7. Lifters for security grates.

  • 6.8. Brass padlocks used for security covers.

  • 6.9. Vacuum testing complete by Berry's and documents filed on the s:drive.

  • 6.10. Interstitial monitor fitted to all tanks.

  • 6.11. Tank capacity to Morrison's specification/P2T.

7. Interceptors.

  • 7.1. Check interceptor channels are complete and clear.

  • 7.2. Interceptor grates fixed securley.

  • 7.3. Interceptor manhole lid to be blue fibrelite.

  • 7.4. Secure ducting sealed.

  • 7.5. Interceptor pipe the correct height (2.4 meters) should not be brown and cowl fitted at the top.

  • 7.6. Interceptor sensor visible on the tank gauge/wet stock provider to confirm prior to splash delivery.<br>

8. Pumps.

  • 8.1. Verified and commissioned for fuel and VR2.<br>

  • 8.2. Pumps working and prices correct.

  • 8.3. Locking bars and padlocks available (including single locking bars).

  • 8.4. VR2 label fitted.

  • 8.5. Calling correctly to EPOS.

  • 8.6. All signage fitted (numbers, operating instructions, Alvern, Magnecap, stanchion legal, m logo).

  • 8.7. Pump bodywork and paint work (check for chips, scratches, build quality).

  • 8.8. Pump level standing check with spirit level.

  • 8.9. Out of order signage available (supplied by purchasing on expenses positive statement).

  • 8.10. Labelling fitted under the pumps (pipework to tank matches as per P2T map).

  • 8.11. Pumps according to Morrison's specification (global v5 pump).

  • 8.12. Temperature compensation fitted and switched off for future use.

  • 8.13. Grade orientation to Morrison's specification.

  • 8.14. Hanging hose and not retraction.

9 LPG.

  • 9.1. Correct pump installed (global v5 LPG).

  • 9.2. Price correct.

  • 9.3. Correct Point of Sale to specification and positioned correctly on pumps (pump number, LPG Operating instructions).

  • 9.4. Divisor nozzle fitted with splasguard.

  • 9.5. Padlock and keys available.

  • 9.6. Individual locking bar supplied by Wayne.

  • 9.7. Compound Cage padlocked and keys available (2 gates).

  • 9.8. Lighting fitted emergency stop signage correct.

  • 9.9. Hazard signage fitted to cage.

  • 9.10. Two x 9kg dry powder extinguishers and boxes in cage.

  • 9.11. Wayne emergency contact number signage fitted with correct details.

  • 9.12. Tank capacity to Morrison's specification (refer to s:drive for clarification).

10. OPT's.

  • 10.1. Working.

  • 10.2. All fuel cards set up correctly (confirm with Fujitsu engineer).

  • 10.3. Keys available (supplied by htec engineer).

  • 10.4. Printer rolls full and spares available.

  • 10.5. Header signage in place (marketing to arrange through signage fitter)...

11. Pole.

  • 11.1. Three line display and built to specification (refer to specification manual located on the s:drive).

  • 11.2. Fuel Prices correct (Petrol Pricing Manager to provide prices for all grades prior to opening).

  • 11.3. Advertising in situ where applicable (marketing to arrange through signage fitter).

  • 11.4. Separate on/off switch for turning off LED in kiosk are labelled and in the back office (standard switch clearly labelled).

12. DEC Box.

  • 12.1. Keys available.

  • 12.2. Telephone working.

  • 12.3. Alarm working.

  • 12.4. Fill point lights (high level and low level) activate when door is opened.

  • 12.5. Pump 2 tank laminated map provided by Vianet displayed in the DEC box.

13. Fire Equipment.

  • 13.1. Fire box, 1.x 6kg powder fire extinguisher and 1 x fire sand bucket with spreading implement.

  • 13.2. Correct amount of extinguishers refer to as built drawings for clarification.

  • 13.3. Sand buckets and spreading tool available.

  • 13.4. Spare sand available.

  • 13.5. Dry powder and CO2 extinguisher available in the kiosk - refer to as built drawings for location.

  • 13.6. Contaminated sand container in situ padlocked, keys and contaminated bags available.

14. Cylinder Gas.

  • 14.1 Training guide and bar codes supplied by Calor.

  • 14.2. Cage as per drawing and drawing filed on the s:drive.

  • 14.3. Door legal signage in place.

  • 14.4. Padlock and keys available.

  • 14.5. Cage full.

  • 14.6. Calor RIsk Assessments completed and filed.

15. Legal signage.

  • 15.1. Fireman's switch and electric switch fitted with correct signage.

  • 15.2. Canopy height restrictions signage fitted.

  • 15.3. Head office licence address signage to be fitted on the front of the kiosk.

16. Non legal signage.

  • 16.1. Current posters displayed to include car wash and opening times.

  • 16.2. Spare set of pump numbers and operating instructions.

  • 16.3. Spare Alvern inserts supplied by marketing.

17. Back office.

  • 17.1. All ducting sealed/electrical cupboard, UPS and by pass switch.

  • 17.2. Notice board 4ft by 4ft back office and store room area.

  • 17.3. E-Site register set up and documentation correct and in place.

  • 17.4. Notice board set up and documentation in place.

  • 17.5. Emergency pack set up.

  • 17.6. File cabinet set up.

  • 17.7. Pump 2 tank map.

  • 17.8. Hazard zone drawing.

  • 17.9. DSEAR complete, approved by forecourt operations manager, filed on the s:drive and tracker updated.

18. Site records - S drive

  • 18.1. Filed on the S:drive:- tank test certificates, pipeline test certificates, chamber testing certificate, DSEAR, Hazard zone drawing, pump 2 tank mapping, and fm site set up document.

  • 18.2. Update site details spreadsheet.

Ready to Trade: Forecourt set up, fuel prices correct on pumps pole sign, pumps primed , OPTs working, Valeting equipment working, PFS open signage displayed, tannoy working

Sign Off

  • PFS Operations Coordinator

  • Forecourt Operations Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.