Title Page
-
Who is completing this audit?
-
Audit Reference
-
Audit Type
-
Job Type
-
Client Name
- Aspire Housing
- Peaks & Plains
- Connexus
- Newark & Sherwood District Council
- Home Plus Group
- East Midlands Homes
-
Location
-
Operative Name
-
Operative Unvented Number
-
Labour Type
-
Inspection Date
Work In Progress
-
Customer Liaison / interaction
-
Operative worked in a safe manner
-
Protection of customers property (e.g. dust sheets used)
-
I.D / Licence card shown
-
Operative knows where to find company RAMS / Technical bulletins etc
-
Safe isolation carried out
-
Preliminary electrical tests done
Appliances
- Appliance Details
-
Photo of appliance
-
Appliance make & model
-
Appliance location
-
Type of inspection
-
Has the operative checked all equipment has been installed in accordance with current building regulations and individual trade legislations?
-
Has the operative checked the safe operation of the system PRV's
-
Has the operative checked what type of system has been fitted? (e.g. pressurised / drain back)
-
Has the operative checked that all pipework from the collectors has been adequately clipped?
-
Has the operative checked the collectors are securely fitted with no roof leaks?
-
Has the operative checked all thermal safety shut off devices are operating correctly?
-
Has the operative checked all thermostats are operating correctly?
-
Has the operative checked the expansion vessel charge?
-
Has the operative checked that the D1 & D2 pipework installed meets IAW document G building regulations?
-
Has the operative checked that the pump station is adequately supported?
-
Has the operative checked the correct pressure on the outlet of the reducing valves?
-
Has the operative checked the draw off temperature at the furthest outlet?
-
Has the operative checked that all components used are steam rated?
-
Has the operative checked all air vents are operating correctly? (auto / manual)
-
Has the operative checked all zone controls are operating correctly?
-
Has the operative checked the system has the correct mixture of antifreeze?
-
Has the operative checked the operation of the NTC's?
-
Did the operative check the pipework is correctly lagged?
-
Has the operative set the controls back to user settings and discussed their operation to the user?
Documentation
-
Is the correct documentation available?
-
Has the work record been completed correctly?
Audit Outcome
-
Audit outcome
-
Who will be involved in closing the corrective actions?
-
What are the recommendations?
-
What actions are to be implemented?
-
What is the target date to have closed the corrective action?
-
Additional Notes
-
Operative Signature
-
Quality Assessor Signature