Title Page
-
Audit completed by
-
Audit reference
-
Audit Type
-
Job Type
-
Client Name
- Aspire Housing
- Peaks & Plains
- Connexus
- Newark & Sherwood District Council
- Homes Plus Group
- East Midlands Homes
-
Location
-
Operative Name
-
Operative Gas Safe Licence Number
-
Labour Type
-
Inspection Date
Work In Progress
-
Customer liaison / interaction
-
Operative worked in a safe manner
-
Protection of customers property (e.g. Dust sheets used)
-
I.D / Licence card shown
-
Operative knows where to find RAMS / Technical bulletins etc
-
Safe isolation carried out
-
Preliminary electrical tests done
Appliances
- Appliance Details
-
Photo of appliance
-
Appliance Make & Model
-
Appliance Location
-
Type of inspection
Appliance Checks
-
1) Type of Control System
- S Plan
- S Plan Plus
- Y Plan
- C Plan
- C Plan Plus
- W Plan
-
2) Max Primary Flow Temperature (Degrees C)
-
3) Inlet Water Pressure (bar)
-
4) Primary Heat Source
-
5) Capacity (Ltrs)
-
6) Pressure Reducing Valve (PRV) Setting (bar)
-
7) Is the service valve working?
-
8) Expansion Type?
-
9) Expansion Vessel Size (Ltrs)
-
10) D1 Installed to MI / BS?
-
11) D2 Installed to MI / BS?
-
12) Material Suitable?
-
13) Tundish?
System Checks
-
13) Relief Valve Type
-
14) Relieve Valve
-
15) Thermostat & Energy cut out?
-
16) Check operation of motorised valve
-
17) Tee present?
Thermostat & Cylinder Checks
-
18) Cylinder and pipework supported?
-
19) Pipework lagged as required?
-
20) Hot water temperature at nearest tap (degrees C)
-
21) Is the appliance safe to use?
Documentation
-
22) Correct documentation available
-
23) Work record completed correctly
Audit Outcome
-
Audit Outcome
-
Who will be involved in closing the corrective actions
-
What are the recommendations
-
What actions have been implemented
-
What is the target date to close the corrective action
-
Additional Notes
-
Operative signature
-
Quality Assessor signature