Title Page

  • Facility Name

  • Facility Location
  • Inspected by

  • Conducted on

Preventive Maintenance Schedule Checklist

  • Select Preventive Maintenance Schedule

  • Tank
  • Tank Type

  • Specify

  • General Condition

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Excessive Noise or Vibration

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Temperature Readings

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • All Valves

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Control System Settings and Operation

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Filters and Strainers

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • All Valves

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Pump Seals

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Control System Settings and Operation

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Filters

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Vibration Isolators

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Control System Settings and Operation

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Cycle Controls and Unloaders Operation

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Crankcase Heaters

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Safety Control Settings

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Lubricating Pump Line Strainers

  • Take photos and add notes to describe the issue

  • Can I repair this now?

  • Take photos and add notes to describe the work done

  • Create an action and assign it with the necessary details, priority level, and due date.

  • Inspector Name & Signature

  • Plant Supervisor Name & Signature

  • Additional Recommendations

Pumps

  • Is there an epta pack on site

  • Bitzer rack

  • Record details of pack. Model and serial number. If no pack on site enter no pack below, so that audit can be completed

Tanks

  • Tank surfaces show signs of leakage

  • Tanks are damaged, rusted, or deteriorated

  • Bolts, rivets, or seams are damaged

Centrifugal Pump

  • Check oil leaks at the gaskets.

  • Check the mechanical seals

  • Check the operation of the heat tracing.

Compressors

  • Check and Log Drive Motor Bearing Temps

  • Change Air Filter

  • Check and log ambient condition

Heat Exchanger

  • Check for signs of fouling or corrosion

  • Check pressure gauges are accurate

  • Check the tubes, noting any damage and replace if needed

Pneumatic signal

  • Check operation of the water traps.

  • Check for and seal air leaks.

  • Lubricate cylinders and pivot points. Check and adjust component movements.

Electric signal

  • Corrosive environments

  • Susceptibility to flood/submergence

Control valve

  • Subcomponent damage

  • Condition of the valve stem and stem nut connector

  • Check and replace Valve Stem

Hand-operated globe valve

  • Regular inspection of the valve

Hand-operated gate valve

  • Cycle the valve at least once a month if not used regularly.

  • Relieve the system pressure before performing any maintenance.

  • To remove from pipework reverse the installation sequence (above).

  • Replace valve gate by removing the top body (bonnet) and stem. Screw out the gate and replace with new part. Install top of body and refit into line.

Basic Proces Control System

  • Schematic diagrams of all equipment and controls

  • Operating instructions including emergency shutdown procedures

  • Contact details for equipment manufacturers, and installation and maintenance technicians

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.