Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Scaffold access, egress

  • Rams signed

  • Loading bay

  • Materials on site

  • Scope of works distributed

  • Correct PPE worn

  • Fixing spec adhered to

  • Fascia at correct height

  • Over fascia vent installed

  • Felt support tray/ 5u installed

  • Rollout rafter tray installed

  • Felt installed to spec

  • Batten staggers

  • Under cloak installed correctly

  • Felt left short of ridge line

  • Materials on site

  • Firewall insulation installed

  • Tiles fixed to manufactures spec

  • Roof marked out

  • Dry valley installed correctly

  • Eave course correct overhang

  • Dry ridge, hip installed correctly

  • Hip irons fixed correctly

  • First and last ridge additional fixing

  • Verge true and straight

  • Headlap suitable for pitch, tile type

  • Excess materials palletised

  • Gutter installed to manufactures recommedations

  • Site over view

  • Scaffold clear and tidy

  • Snagging completed

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.