Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Scaffold access, egress
-
Rams signed
-
Loading bay
-
Materials on site
-
Scope of works distributed
-
Correct PPE worn
-
Fixing spec adhered to
-
Fascia at correct height
-
Over fascia vent installed
-
Felt support tray/ 5u installed
-
Rollout rafter tray installed
-
Felt installed to spec
-
Batten staggers
-
Under cloak installed correctly
-
Felt left short of ridge line
-
Materials on site
-
Firewall insulation installed
-
Tiles fixed to manufactures spec
-
Roof marked out
-
Dry valley installed correctly
-
Eave course correct overhang
-
Dry ridge, hip installed correctly
-
Hip irons fixed correctly
-
First and last ridge additional fixing
-
Verge true and straight
-
Headlap suitable for pitch, tile type
-
Excess materials palletised
-
Gutter installed to manufactures recommedations
-
Site over view
-
Scaffold clear and tidy
-
Snagging completed
-
Add media