Title Page
-
Document No.
-
Electrical Site Audit
-
Regional Office
-
Conducted on
-
EQS
-
Property Address
-
Operative Name
-
Operative has correct tool and equipment, Inc. Lock Off Kit, Proving Unit, Voltage Tester and Safety Signs
-
Add media
-
Operative demonstrates Safe Isolation Procedure while working
-
Add media
-
Satisfactory Visual Inspection of Mains Supply Conductors and Mains Earthing Conductor
-
Add media
-
Satisfactory Visual Inspection of Mains Bonding Conductors
-
Add media
-
Adequacy of Labelling of Mains Bonding Conductors
-
Add media
-
Satisfactory Visual Inspection of Correct Labelling at Consumer Unit, Inc. Schedule of Circuits
-
Add media
-
Satisfactory Check of Accessories with no signs of damage or thermal effects
-
Add media
-
Confirmation of a R1 + R2 reading, please specify circuit and reading
-
Add media
-
Visual inspection of RCD/RCBOs/MCBs ensuring correct Rating and Application
-
Add media
-
ZE and PFC Check, Polarity Confirmed and Results Verified
-
Add media
-
Correct Certification Issued
-
Add media
-
Post Inspection Satisfactory
-
Add media
-
EQS Signature
-
Electricians Signature