Information
-
Document No.
-
Electrical Site Audit
-
Regional Office
-
Conducted on
-
EQS
-
Property Address
-
Operative Name
-
Operative has correct tools and equipment, Inc. Lock Off Kit, Proving Unit, Voltage Testers and Safety Signs
-
Operative demonstrates Safe Isolation Procedure while working
-
Satisfactory Visual Inspection of Mains Supply Conductors and Main Earthing Conductor
-
Add media
-
Satisfactory Visual Inspection of Mains Bonding Conductors
-
Add media
-
Adequacy of Labelling of Mains Bonding Conductors
-
Add media
-
Satisfactory Visual Inspection of Correct Labelling at Consumer Unit, Inc. Schedule of Circuits.
-
Add media
-
Satisfactory Check of Accessories with no signs of damage or thermal effects
-
Add media
-
Visual inspection of RCDs/RCBOs/MCBs ensuring correct Rating and Application
-
Add media
-
ZE and PFC Check, Polarity Confirmed and Results Verified
-
Add media
-
ZS Test at Socket Outlets, Results Verified
-
Add media
-
Correct Certification Issued
-
Add media
-
Post Inspection Satisfactory
-
EQS Comments
-
EQS signature
-
Electricians signature