Title Page
-
Job Number
-
Location
-
Client Details
-
Conducted on
-
Prepared by
Type of work undertaken
-
Removal
-
Repair
-
Encapsulation
-
Environmental Clean
General site information
-
ASB5
-
NNLW
-
Non Licenced Work
-
F10
-
Project team details
Site access and working arrangements
-
Start date
-
Finish date
-
Duration of project
-
Working times?
-
Mon-Fri?
-
Weekend Working?
-
Shift working?
-
Shift pattern?
-
Continual works?
-
Out of hours working?
-
Number of operatives per shift?
-
Number of supervisors per shift?
-
Void property?
-
Access arrangements?
-
Occupied property?
-
Access control to asbestos removal working area?
Type of premises
-
School
-
Office
-
Factory
-
Retail
-
Residential
-
Other
-
Please state
Vehicle and skip access
-
Good
-
Poor
-
Other
-
Please state
-
Photo where van is located
-
Please state
-
Photo where waste van/skip is located
-
Please state
Hygiene Facility (DCU)
-
Direct connection?
-
If NO justification? (Eg flat)
-
Modular
-
Standard
-
Alley cat
-
Self contained
-
Photo where DCU is to be located
-
Photo were water is to be obtained
-
Please state
-
Photo were power is to be obtained
-
Please state
-
Photo were foul drain is located
-
Please state
Quantity of asbestos waste and disposal arrangements
-
Estimated amount of waste generated by works (bags, wraps, weight)
-
Is skip required?
-
Photo were skip is to be located
-
Location and size
-
RIS Sulo bin or dedicated waste compartment
-
Coharts
-
ATS
-
Bowmers
-
Pinden
Survey details (if any)
-
Analytical company name
-
Management
-
Refurbishment
-
Bulk samples
-
Other
Type of asbestos
-
Amosite
-
Chrysotile
-
Crocidolite
-
Other
-
state which type
Type of application
-
Pipe work
-
Soffit
-
Ceiling
-
Wall
-
Debris
-
Floor
-
Roof
-
Beams/cross sections
-
Internal/External
-
Photo(s) of asbestos location(s)
Type of ACM
-
Spray coating
-
Cement
-
Insulation
-
AIB
-
Textured coating
-
Debris (material type unknown)
-
Other
-
state which
Condition of asbestos
-
Good
-
Poor
-
Fair
-
Requires pre clean
-
Other
-
state which
Asbestos fixings
-
Nailed
-
Screwed
-
Bolted
-
Other (eg glued)
-
state which
Existing services (pipe work, plant)
-
In service
-
Off line
-
Redundant
-
N/A
-
Photo(s) of services (if any)
Emergency arrangements
-
Fire
-
First Aid
-
Client/ PC arrangements
-
Photo(s) of muster points
-
state where
Control measures to be taken
-
Fully controlled
-
Two stage
-
Respirator zone
-
Speed frame
-
Timber frame
-
state what size
-
Bag lock?
-
If NO justification?
-
CCTV
-
How many
-
VIsion panels?
-
How many?
Working techniques to be used
-
Injection machine (BS8520)
-
Spray bottle
-
Airless sprayer
-
Encapsulation
-
Internal/External
-
Wrap and cut
-
Shadow vac
-
Partial enclosure
-
Other (eg ALG Memo 03/12)
-
State which
Working at height requirements
-
None
-
Ladders
-
Steps
-
Podiums
-
Internal/External
-
Hop ups
-
Tower scaffolds
-
Fixed scaffolds
-
Does the scaffold need a licence or design?
-
Qty
-
Types
-
Mobile elevated working platform?
-
Type required
Analytical services
-
Sensible Asbestos Solutions
-
Ace Consultants
-
Environtec
-
Leftfield Environmental
-
REC
-
CARE
-
DMV
-
Shield Onsite Services
-
Anchem
-
PCS Asbestos Consultants
-
Bradley Environmental
-
4 stage
-
Reassurance
-
Air test RIS van
-
Personal, background and leaks
-
Perimeter testing
Enclosure/respirator zone(s) details (location and sizes)
-
Enclosure/respirator zone 1
-
Photo of enclosure/respirator zone 1
-
Enclosure/respirator zone 2
-
Photo of enclosure/respirator zone 2
-
Enclosure/respirator zone 3
-
Photo of enclosure/respirator zone 3
-
Enclosure/respirator zone 4
-
Photo of enclosure/respirator zone 4
-
Enclosure/respirator zone 5
-
Photo of enclosure/respirator zone 5
Fibre control equipment
-
500 NPU
-
1000 NPU
-
1500 NPU
-
2000 NPU
-
4000 NPU
-
H type vac
-
Multi point injection
-
Is water available on site?
-
Photo of water location
-
If no how is to be sourced?
-
Is power available on site?
-
If no how is to be sourced?
-
240 volt, 110 via transformer
-
10kva hard wired
-
Photo of power supply
-
If no how is to be sourced?
Transit and waste route
-
Waste route to skip or waste van
-
Photo of route
-
Transit route to DCU
-
Photo of route
Safety wear
-
Full face mask
-
Half face mask
-
Type 5/6 disposable overalls
-
Safety boots
-
Gloves
-
Hard hats
-
Ear protection
-
Googles
-
Hi vis vest
-
Fall arrest (harness and lanyard)
-
Other
-
State type
Non asbestos risk assessment
Access and egress
-
Any restricted access?
-
Confined spaces?
-
Working at height?
-
Work equipment?
-
Adequate lighting?
-
Fragile roofs?
-
Unstable work areas?
Work at height
-
Edge protection?
-
Hand rails?
-
Harnesses?
-
Fragile roof?
-
Equipment?
Work environment
-
Adequate lighting?
-
Floors/walkways in good condition?
-
Any spill ages or even ground?
-
Are stairs in good condition?
-
Explosive atmosphere?
-
Hot/cold environment? (Plant room, boiler/chill store)
-
Hot/cold surfaces? (Radiators/pipe work)
-
Noise
-
Sharps? (Needles, broken glass etc)
Services
-
Are services are to be isolated?
-
Isolated by?
-
Are services are concealed?
-
Where?
-
Gas
-
Water
-
Steam
-
Electric
-
Other
-
State type
Debris
-
Existing debris
-
Sharps?
-
Guano?
-
Other
-
State type
Water
-
Is there area likely to be flooded?
-
Is the area near water?
Over hazards
-
Rats
-
Pigeons
-
Dermatitis
-
Mold
-
Hand Arm Vibration
-
Manual Handling
Fire
-
Sources of heat?
-
Sources of fuel (flammable materials, liquids)
-
Hot works?
COSHH
-
Hazardous chemicals present or to be used?
-
Special PPE/RPE required?
Welfare
-
Supplied by the client?
-
Supplied by RIS?
Additional comments
-
Add drawing
-
Add drawing
-
Add media