Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Manager SIgn-Off

Plant CI Manager LSW

Daily

  • Participate in as well as Audit Tier 2 meetings per Standard Work (Action based mtg using Problem Solving)

  • Audit Leader Std Work for Plant Management to make sure it's being fill-out, posted and reviewed per std. work.

  • Walk the floor and audit lines per Supervisor - Line Audit - SWIS

Weekly

  • Lead DT/Engineering Reviews

  • Review CI A3

  • Facilitate a Waste Elimination Gemba's per Std Work with at least two members from plant management

  • Audit One Tier 1 Meeting per Std Work

  • Verify that Plant Management is reviewing, updating and posting (in T2 room) their Top3 A3's

  • Verify that BU's respective Top3 A3 Summary file (Teams) is up-to-date and Newpaper is being used to note C/A for A3's missing target

Monthly

  • Complete 4 SBO

  • Complete Monthly OEE

  • Complete Monthly DT

  • Complete 6S Event

  • Conduct one Shopfloor Kaizen

  • Faciltate one probelm solving session with shopfloor associates

  • Audit one sub-section of the PEPS - CI element

Quarterly

  • Verify that three Top3 A3's have created (per std work), loaded into Teams, and then added to the BU's respective Summary file in Teams as well.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.