Title Page
-
Date
-
Shift #
-
Name
Workstation Specific
-
Select the note button to add a comment or a corrective action taken statement.
Records
-
Are safety issues, or documented LPA Audit safety items, being assigned and corrected on a timely basis? (VIEW NCF LOG)
-
Are Maintenance & Repair items identified on the LPA Audit being corrected on a timely basis? (VIEW NCF LOG - WO'S)
-
Are work station organization and 5S issues identified being assigned and corrected on a timely basis? (VIEW NCF LOG)
-
For LPA's that indicated failure in start-up/end of shift checks, TPM Checklists, and 1st piece inspection, is there evidence that management is working to correct these? (IF APPLICABLE, VIEW IN NCF LOG)
-
For LPA's that indicated work instructions, Quality Alerts and / or Increased Inspection documents were not available and/or signed by operators, is there evidence that management is working to correct these? (VERIFY IN NCF LOG)
-
Are Quality Alerts and Increased Inspections effective in guarding against non-conforming product being shipped to the customer? (VERIFY THROUGH QUALITY KPI"S)
-
Are the Layered Audits being performed as scheduled by all levels of the organization? (SEE LPA TRACKER)
-
Are KPI countermeasures tracked and demonstrating appropriate follow up? (SEE MGT ACTION ITEMS)
-
Overall, when looking at the LPA NCF Log, does it appear that corrective actions are being implemented in a timely manner? (VIEW NCF LOG)
Plant Floor
-
In viewing Casting Plant for organization, safety & cleanliness during plant walk, are there any areas that you feel needs specific focus? (FLOOR AUDIT)
-
Is there evidence that Standardized Work Instructions and/or SPL's are present at each work cell? (FLOOR AUDIT)
-
Is Andon system (shop radio's) effective? Is the escalation process understood by operators, and does the Immediate Response Board reflect actions taken on findings? (FLOOR AUDIT)
-
Are Fast Response meetings taking place and all records up to date? (VERIFY IN FISHBOWL CONF. ROOM)
-
Is there evidence that the process of handling non-conforming product is being handled properly? (VERIFY IN MRB AREA)
-
Is Production Control Form (MFG 001) up to date, are all down-times being recorded (w/codes) and corrective actions implemented to prevent recurrence? (FLOOR AUDIT)