Project Managers Safety Walk
-
Site conducted
-
Prepared by
- Filip Mihalcea
- Eusebiu Lucaci
- Ionel Dancă
- Ionut Reteanu
- Sebstian Baidoc
- Sorin Aron
- Lucia Frunze
- Ilie Gramada
-
Conducted on
-
Is there a signed safety policy with other appropriate company policies in place?
-
Have you made all Platt Reilly operatives aware of their location? <br>Signage Recorded?
-
Do you have adequate facilities to maintain paperwork & safely materials on site?
-
Are toilet & canteen facilities adequate with a supply of drinking & hot water?
-
Are training records copied & attached to Induction forms?
-
Have all Platt Reilly operatives been safely inducted by Platt Reilly & the Main Contractor?
-
Are all method statements live & communicated with signage recorded?
-
Is there a requirement to prepare Method Statements?
-
Contact Martin now!
-
Have accidents taken place?
-
Have they been investigated & forwarded to head office?
-
Are Project Access arrangements adequate?
-
Are there physical hazards?
-
Give details & attach photos.
-
Are working at height arrangements adequate? Certificates in place & current?
-
Are GA2 / GA3 records complete?
-
Are manual handling arrangements adequate?
-
Are housekeeping arrangements adequate?
-
Are temporary lighting / power supply arrangements adequate?
-
Are there trained first aiders & first aid kit? Is your team aware of this?
-
Are all employees wearing appropriate PPE?<br>Have you recorded every item issued?
-
Are emergency procedures in place?
-
Is safety signage adeqaute?
-
Are security arrangements adequate?
-
Is the site fully enclosed?
-
Are toolbox talks taking place with the subject literature attached?
-
Is there a requirement to provide a safety representative?
-
Any other?