Title Page
-
Site conducted
-
PM009
-
Conducted on
-
Prepared by
-
Location
- UPS
-
Photo of UPS
-
Record the UPS Location on site
-
Is the room/server rack clean?
-
Are the cooling fans operational/A/C operating and room at 20-26?
-
Record the input voltage (if available)
-
Record the output voltage (if available)
-
Record the output frequency (if available)
-
Record room temperature (if available)
-
Record device temperature (if available)
-
Alarms (including alarm log)
-
Photo of Alarm
-
Record batteries charge level
-
Automatic mode check
-
In rack / is the unit mounted correctly as per instructions
-
In rack / is the unit connected to essential power
-
In rack / are there any visual or audible warnings
-
Is the unit ON and operational
-
Check load % and record (if available)
-
Comments
Actions/Comments
-
Actions/Comments
-
Signature
-
Date/Time: