Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Names
-
Location
Site Set Up
-
1. Familiar or Inducted onto the site?
-
Do not start work until you are familiar or have been inducted
-
2. Signed onto the site?
-
Ensure the customer is aware you are on site
-
3. Adequate task specific PPE for the works?
-
Do not start work until you have adequate task specific PPE , Issues - report
-
4. Welfare available on site e.g. Toilets, Washing Facilities,?
-
Do not start work ,Issues - report
-
5. Pre inspection of the work tools and equipment checking for faults or damage?
-
Do not use, Replace where necessary, Issues - report
-
6. Ensure adequate safe protection of the work area?
-
Do not start work until a safe work area can be established, Issues - report
Hazards
-
1. Are there any significant Slips, trips or falls on site?
-
Remove significant STF Hazards before undertaking your works?
-
Issues - Report
-
2. Are there any risk of falls from height?
-
Implement adequate controls to prevent falls from height e.g. Avoidance, Mechanical Platforms, Barriers, PPE - Restraint/Arrest.
-
Issues - Report
-
3. Does the work involve the use of COSHH (Substances Hazardous to Health)?
-
Ensure you understand the relevant COSHH risk assessment for the substance being used e.g. Segregation, PPE
-
Issues - Report
-
4. Is there a risk of Falling objects, Materials?
-
5. Protect work area e.g. Segregation, Barriers, PPE -Hard hats
-
Issues - Report
-
6. Is there a risk of Heat/Fire/Explosion/Hot works
-
Ensure ignition sources are separated from sources/fuels, segregation controls, appropriate extinguishers nearby
-
Issues - Report
-
7. Risks towards Asbestos
-
Ensure you have Asbestos awareness, request Asbestos building register, (DO NOT DISTURB ASBESTOS CONTAINING SUBSTANCES)
-
Issues - Report
-
8. Risks towards Collapse
-
Do not work until structure, equipment, excavation, building has been certified safe - supports fitted.
-
Issues - Report
-
9. Risks of Manual handling<br>
-
Avoid by using mechanical means, splitting loads, team lifts, Kinetic handling - TILE (Task, Individual, Load, Environment)
-
Issues - Report
-
10. Risks towards Plant & Vehicle movements<br>
-
Separate and segregate people from plant/vehicle movements, barriers, PPE, Banksman/Watcher
-
Issues - Report
-
11. Risks towards Confined spaces (Permit Req’d)<br>
-
Do not undertake work in a confined space unless trained and competent and a PTW has been issued
-
Issues - Report
-
12. Risks of Noise<br><br>
-
Do not work in noisy environments without adequate protection, isolate noise source, mandatory ear defenders at 85db
-
Issues - Report
-
13. Risks towards Temperature Hot/Cold<br>
-
Ensure body is protected with garments to protect from cold, ensure relevant PPE including sun protection from heat, accompanied with job rotations and exposure times
-
Issues - Report
-
14. Risks of Vibration<br><br>
-
Identify exposure limits through HSE calculations, Vibration Monitoring devices, Job rotations and exposure times, Hand vibration PPE
-
Issues - Report
-
15. Risks towards Electricity<br><br>
-
Trained and competent, Isolation of power sources, Segregation, Lock out , Tag out, PPE
-
Issues - Report
-
16. Risks towards Contamination - Chemicals, Fumes<br><br>
-
Eliminate substance or chemical by replacing it, COSHH risk assessment controls available - PPE requirements, Barriers/segregation
-
Issues - Report
-
17. Risks of Poor lighting<br><br>
-
Do not undertake work until, you have appropriate lighting, torches, headlamps, portable lighting, work in daylight hours
-
Issues - Report
-
18. Risks towards Adverse weather<br>
-
Do not work unless you and equipment can be adequately protected (outside) PPE, Tents, Shelters
-
Issues - Report
-
19. Risks towards Dust/Fumes<br>
-
Do not work until ventilation/extraction of dust/fumes is adequate, isolation, segregation, exposure times, PPE
-
Issues - Report
-
Additional notes
Completion
-
Supervisor signature