Title Page
-
Pollution recording
-
Does the site have consent to discharge?
-
Pollution to land or water?
-
What are the last 5 entries in the log book? Please attach picture
-
What is the date and time?
-
Time arrived on site?
-
Contacted about job at what time?
-
Pumping station location
-
Reported to pollution desk?
-
Clean up required?
-
Have you taken pictures of the following? Wet well, spilling point, watercourse
-
Number of pumps available
-
Multi smart?
-
Type of power failure?
-
Pump configuration (duty, assist, standby?)
-
How is it polluting? E.g pipe work, overflow
-
State of wet well cleanliness?
-
Spill time? If known.
-
Are tankers being used? If so how many?
-
Standby generator on site? In use?
-
Who is on site?
-
Weather conditions?
-
Extra notes to add?