Title Page
-
Conducted on
-
Address
-
Engineers name
-
Engineers telephone number
-
Work order number
-
Work order type
Safety
-
Site specific risk assessment carried out
-
Access gain to property
-
Internal gas surveyed around service entry
-
Building line letter box checks carried out
-
Leakage survey line of service carried out
Job specific engineering details
-
Working and standing pressures tested
-
Follow on work identified
-
Is access required
-
Is service dualled
-
If yes, specify number dualled with
-
Will any works be required in the public
-
Is traffic management required
-
If yes please specify
- pedestrian walkway in road
- carriageway incursion two way traffic maintained
- two way traffic lights required
- three way traffic lights required
- four way traffic lights required
- bus/cycle lane suspension required
- above 30mph speed limit
-
Engineering difficulties on site
-
If yes please specify
- unable to park vehicle
- location is on a blind bend
- existing service is 3/4" steel
- up and under service
- existing service is located in open cavity
- existing service built over
- meter box required
- imprinted concrete driveway
- landscaped garden
- rendered building
- lead/ copper service pipe
- long drill and long house entry
-
Any other difficulties please specify
-
Does service cross the road
-
Internal alter position required
-
Is 28mm pipe required
-
If yes specify amount needed in meters
Customer details
-
Customer name
-
Customer's preferred contact number
-
Customers email address
-
Resource management to plan
-
Customer's preferred plan date (minimum 2 weeks notice needed)
-
Has this been confirmed with resource management
-
Has new meter location been agreed
-
If yes please specify agreed location
-
If dual service identified, contact details for second customer
-
Name
-
Contact number
-
Email address
-
Photos