Title Page
-
WO number
-
Engineer Name
-
Payroll number
-
Address
Service/Pipe Summary
-
Pressure
-
Has 100mbar/ 5 min test been carried out
-
Test date
-
Meter location
-
Sub location
- inserted
- house entry
- meter box
- built in
- semi con
- surface mounted
- cellar entry
-
Entry point
-
Dual S.P indicator
-
Road crossing?
-
Interruption category
- damaged
- leakage
- interrupted in error
- network failure
- planned work
- service alteration
-
Gas restored to ECV date and time
-
Left alternative heating/cooking appliance?
-
Reason for not leaving appliances
-
Reason for leaving appliances
Pipe details
-
Diameter
-
Length laid (M)
-
Material
-
Length of cut back (M)
-
Joint type
-
SDR
-
Method laid
-
Insertion point
-
Service depth of cover (M)
Contact details
-
Contact name
-
Phone number 1
-
Phone number 2
Reinstatement requests
-
How many excavations are there
Reinstatement info
-
Property name/ number
-
Required or completed
-
Backfill only, reinstate only, backfill and reinstate
-
Final or ongoing request
-
Public/Private
-
Surface location
- footway
- carriageway
- grass verge
- garden
- cycleway
- drive
-
Exact location
-
Dimensions LxWxD (M)
-
Surface category
- DBM
- FBM
- HRA
- SMA
- sand carpet
- flags
- concrete
- crazy paving
- setts
- block paving
- gravel
-
Special surface
-
H code
-
Barholes
-
Kerb stone
-
Drain/ duct repair
-
Other additional information
-
Urgent
-
Photos
-
Road plate to be collected
-
Traffic lights to be collected
-
Chapter 8 to be collected
-
Number of inspection units
-
Surplus
-
Any permanent road markings require replacement
Completion form
-
Job completed
-
Site report
-
Was there an explosion
-
Was there a fire
-
Was there a fatality
-
Was there an injury
-
Any evacuations
-
Was there gas in building
-
Was BA worn
-
Photos