Information
-
Document No.
-
Conducted on
-
Prepared by
Possession Details
-
WON Area & WON Week Number
-
Possession Reference Number
-
Item Number
-
Possession Limits
Possession Support Staff Details (PSS)
-
Staff Name
-
Employer
Location Details
-
Geographical Location Name
-
Line of Route & ELR reference
-
Access Point Name (including local name if relevant)
-
Has the PSS used an authorised access point?
Competence
-
Is the PSS in possession of their SENTINEL card?
-
Copy of SENTINEL Card
-
Is the SENTINEL card valid? <br>(Poor/damaged/tampered photograph readers card as invalid)
Safe Systems of Work (SSOW)
-
Does the PSS have a pre-planned SSOW?<br>(If accessing within the possession limits SSOW not required)
-
Is the SSOW suitable for the planned arrangements?
-
If accessing within the possession limits do they have suitable information for their planned work?<br>Diagram, WON extract & work instruction.
-
Have there been any changes to the planned SSOW?
Personal Protective Equipment
-
Is the PSS wearing full PPE?<br>High visibility upper body & lower body clothing.<br>Safety Helmet.<br>Safety boots.
-
Is the PPE in good clean condition clearly marked with the individuals correct sponsor?
-
Is the PSS in possession of the correct equipment?<br>Head torch.<br>Access keys.<br>SPRS.<br>Detonator Tube and metal ammunition box.
Protection Arrangements
-
Protection Limits - Beyond
-
Protection Limits - Approach
-
Has the PSS placed protection as planned and instructed by the PICOP?
-
Is the protection suitable?<br>In the correct location, in good working order, detonators in date, correct amount.
Other Observations
-
Detail any observations of good or bad practice - such as communications/dealing with trains.
-
Photographs of any non conformance where applicable, i.e. defective PLB etc